Maintenance | Model 6750 |
|
|
3.Place tubing in the right groove and against the first two rollers.
4.Hold tubing with thumb.
5.Near groove, insert smaller prong of loading key between the top of the rotor and tubing.
6.Push key in as far as possible.
7.Push down and turn key counterclockwise (ccw) completely around the rotor.
8.The key will push the tubing uniformly into the end bell assembly.
9.Hold the second end of tubing.
10.Remove the key.
Teledyne Analytical Instruments | 66 |