Teledyne 6750 operating instructions Module Service, 5.3.1NDIR Gas Calibration

Models: 6750

1 96
Download 96 pages 40.67 Kb
Page 57
Image 57
5.3 Module Service

Total Organic Carbon Analyzer

Maintenance

 

 

5.3 Module Service

5.3.1NDIR (Gas Calibration)

1.From the Menu, select [CALIBRATE]. The following screen will appear:

2.Select [INFRARED ANALYZER]. The following Screen will appear:

3.Disconnect tubing from reactor output and connect IR calibration adapter (P/N ST20026) as shown in Figures 5- 1, 5-2, and 5-3.

4.Connect facility tubing to “Zero” and “Span” Gas Bottles

Teledyne Analytical Instruments

45

Page 57
Image 57
Teledyne 6750 operating instructions Module Service, 5.3.1NDIR Gas Calibration