Teledyne 6750 Total Organic Carbon Analyzer, Setup and Operation, Maintenance

Models: 6750

1 96
Download 96 pages 40.67 Kb
Page 7
Image 7
Setup and Operation

Total Organic Carbon Analyzer

3.3

Electrical Connections

23

3.3.1 Power Connection

23

3.3.2 Analog Outputs

24

3.3.3 Alarm Connections

25

3.3.4 RS-232 Serial Connection

25

3.4

Gas/liquid Connections

25

3.4.1 Liquid Connections

25

3.4.2 Gas Connections

26

3.5

Checking the System

27

Setup and Operation

29

4.1

Analyzer Startup

29

4.2

Menus

31

4.2.1 Run Mode

31

4.2.2 Parameter Menu

32

4.2.3 Alarm Settings

33

4.2.4 Stream Sequencer

34

4.2.5 D/DBPR

35

4.3

Detailed Calibration Procedures

36

4.4

Operation

40

4.5

Shutdown

41

4.6

Historical Data

41

Maintenance

43

5.1

Compupter-aided Testing

43

5.2

Troubleshooting

44

5.3

Module Service

45

5.3.1

NDIR (Gas Calibration)

45

5.3.2

NDIR Service

47

5.3.3 Master Interface Board (P/N ST13042-1).

53

5.3.4

D. C. Power Supply

54

5.3.5 CE Computer (P/N 13039)

55

5.3.6 UV Lamp (P/N ST20009)

56

5.3.7 UV Reactor Assembly (P/N ST20003-1)

57

Teledyne Analytical Instruments

vii

Page 7
Image 7
Teledyne 6750 Total Organic Carbon Analyzer, Setup and Operation, Maintenance, Teledyne Analytical Instruments