Total Organic Carbon Analyzer

Installation

 

 

 

Installation

This manual contains “AS BUILT” drawings and a parts list to aid in the installation and operation of the analyzer. These drawings should be referred to when ordering spare parts, operating or servicing the equipment. See the Appendix for the AS BUILT drawing package.

Installation of the Model 6750 On-line UV/Heated Persulfate TOC Analyzer includes:

1.Unpacking

2.Mounting

3.Electrical Connections

4.Gas Connections

5.Testing the System

3.1Unpacking the Analyzer

The analyzer is shipped with all the materials you need to install and prepare the system for operation. Carefully unpack the analyzer and inspect it for damage. Immediately report any damage to the shipping agent.

3.2 Mounting the Analyzer

The analyzer is for indoor use in a general purpose area. The Hazardous Area Option should be used for applications involving hazardous areas.

The standard model is designed for wall or rack mounting. Figure 3-1 is an illustration of the mounting and Figure 3-2 shows the required front door clearance. There are four mounting holes – one in each corner of the enclosure. Refer to “As Built” drawings in the Appendix.

Teledyne Analytical Instruments

21

Page 33
Image 33
Teledyne 6750 Unpacking the Analyzer, Mounting the Analyzer, Total Organic Carbon Analyzer Installation