Thermador P24GE, PC30 Wok Operation, Wok Assembly, Wok Support Ring, Flat Bottom Pot, Wok Trivet

Models: P24GE PC30

1 64
Download 64 pages 47.65 Kb
Page 23
Image 23
Wok Operation

Section 5: WOK OPERATION

Wok Operation

WOK ASSEMBLY

Wok Trivet

1.Remove all packaging materials and tempo- rary labels from the wok pan.

2.Make sure that the plastic ties used for shipping have been removed.

21-3/4"

( 55.2 mm)

Wok

Support

Ring

(attached to

cooktop)

3.Check that the support ring is properly placed above the burner.

4.Place wok pan into support ring before turning on the burner.

5.Turn the control knob to the LITE position. After 45 to 60 seconds, turn to the heat setting.

6.It is normal for the wok pan to discolor and darken with use. This indicates that it is well seasoned.

Flat Bottom Pot

12-3/4"

(32.4 cm)

5"

(12.7 cm)

Trivet

Wok

Support

Ring

(attached to

cooktop)

Use the trivet to support a flat-bottom wok or a large stock pot.

Assemble as shown in the drawing above.

21

Page 23
Image 23
Thermador P24GE, PC30 Wok Operation, Wok Assembly, Flat Bottom Pot, Trivet Wok Support Ring, Wok Trivet