Toshiba RAV-SM560BT-E, RAV-SM800AT-E 142, RAV-SM560UT-E, Cutting of Capillary Tube, Ref No

Models: RAV-SM800BT-E RAV-SM560BT-E RAV-SM560AT-E RAV-SM560UT-E RAV-SM800UT-E RAV-SM800AT-E

1 181
Download 181 pages 61.65 Kb
Page 142
Image 142
RAV-SM560UT-E

15-2. Replacement of Distributor Assembly

RAV-SM560UT-E

1. Cutting of Capillary Tube

 

 

A capillary tube ( 023

: Inner diameter 2mm, Length 1000mm) is brazed to a distributor assembly. Cut and

divide the tube to each length as shown below.

 

 

 

 

 

 

 

 

Ref No.

No. of capillary tubes

Cutting

 

 

 

 

 

 

 

023

4

200 mm : 2 pcs.

 

 

400 mm : 2 pcs.

 

 

 

 

 

 

 

 

 

 

[Cutting]

Plane circumference of the capillary tube with triangle file, etc., and then break off it.

NOTE) Break off the capillary tube so that inner diameter is not deformed

2.Attachment of joint pipe

Insert the attached joint pipe into the end of the capillary tube up to 15mm, and braze it.

Form the capillary tube as same as that in the distributor assembly before replacement.

3.Brazing to indoor heat exchanger

Attach the capillary tube processed in items 1 and 2 to the end of the pipe with brazing as shown below.

023

142

Page 142
Image 142
Toshiba RAV-SM560BT-E, RAV-SM800AT-E 142, RAV-SM560UT-E, Cutting of Capillary Tube, Ref No, No. of capillary tubes