13 | Top Section | |
| ||
Tools Needed: | Place the top section in the opening. | |
Hammer | Temporarily secure the top section | |
by driving a nail in the header near | ||
| ||
| the center of the door and bending it | |
| over the top section. Now flip up hinge | |
| leafs, hold tight against section, and | |
| fasten center hinges first, and end | |
| hinges last. (Refer to Step 8). When | |
| installing a door with a TorqueMaster® | |
| Plus counterbalance system, vertical | |
| track alignment is critical. Position | |
| flagangle between | |
| to | |
| the door; tighten the bottom lag screw. | |
| Flagangles must be parallel to the door | |
| sections. Repeat for opposite side. | |
| IMPORTANT: THE DIMENSION | |
| BETWEEN THE FLAGANGLES MUST BE | |
| DOOR WIDTH PLUS | |
| ||
| DOOR OPERATION. | |
| For quick install track: | |
| Complete the vertical track installation |
door width
by securing the center jamb bracket(s) |
and tightening the other lag screws. |
Repeat for opposite side. |
For fully adjustable track: |
Complete the vertical track installation |
by securing the center jamb bracket(s) |
and tightening the other lag screws. |
Push the vertical track against the |
rollers so that the rollers are touching |
the deepest part of the curved side of |
the track (see illustration); tighten all |
the track bolts and nuts. Repeat for |
opposite side. |
NAIL
top section
vERTICAL tRACK
ROLLER
ROLLER Against
VERTICAL TRACK
Fully adjustable
FLAGANGLE
top
SECTION
18