4 | Installing Q.I. Jamb Brackets |
|
|
|
|
| |||
|
|
|
|
|
| ||||
Tools Needed: | Measure the length of the vertical tracks. |
|
|
|
|
| |||
None | Using the jamb bracket schedule, |
|
|
|
|
|
| ||
determine the placement of the jamb |
|
|
|
|
| ||||
|
|
|
|
|
| ||||
| brackets for your door height and track |
|
|
|
|
| |||
| type. To install the jamb brackets, |
|
|
|
|
|
| ||
| align the twistlock tab on the quick |
|
|
|
|
| |||
| install jamb bracket with the quick |
|
|
|
|
|
| ||
| install feature in the track and turn the |
|
|
|
|
| |||
| bracket perpendicular to the track so the |
|
|
|
|
| |||
| mounting flange is toward the back (flat) |
|
|
|
|
| |||
| leg of the track. |
|
|
|
| left side shown | right side shown | ||
|
|
|
|
|
| ||||
|
| JAMB BRACKET SCHEDULE |
| twistlock tab | 3rd SET HOLES | ||||
|
|
|
|
| |||||
| DOOR | 1ST SET | 2ND SET | 3RD SET |
|
| |||
|
|
|
|
|
|
|
|
| |
| HEIGHT | JAMB BKT | POSITION | JAMB BKT | POSITION | JAMB BKT | POSITION |
|
|
|
|
|
| ||||||
| 6’0” 64” TRACK | QIJB - 5 | MIDDLE | QIJB - 6 | BOTTOM | NOT APPLICABLE |
|
| |
| (1626 mm) |
|
| ||||||
|
|
|
|
|
|
|
|
| |
| 6’5” 69” TRACK | QIJB - 3 | BOTTOM | QIJB - 6 | MIDDLE | NOT APPLICABLE |
| 2nd SET HOLES | |
| (1753 mm) | QI jamb bracket | |||||||
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| |
| 6’8” 72” TRACK | QIJB - 3 | BOTTOM | QIJB - 6 | MIDDLE | NOT APPLICABLE | Top |
| |
| (1829 mm) |
| |||||||
|
|
|
|
|
|
|
| ||
| 7’0” 76” TRACK | QIJB - 3 | BOTTOM | QIJB - 7 | TOP | NOT APPLICABLE | hole |
| |
| (1930 mm) |
|
| ||||||
|
|
|
|
|
|
|
|
| |
| 7’3” 79” TRACK | QIJB - 3 | BOTTOM | QIJB - 5 | BOTTOM | QIJB - 6 | BOTTOM | Middle |
|
| (2007 mm) |
| |||||||
|
|
|
|
|
|
|
| ||
| 7’6” 82” TRACK | QIJB - 3 | BOTTOM | QIJB - 5 | BOTTOM | QIJB - 6 | BOTTOM | hole | 1st SET HOLES |
|
| ||||||||
| (2083 mm) |
|
|
|
|
|
|
|
|
| 7’9” 85” TRACK | QIJB - 3 | BOTTOM | QIJB - 5 | BOTTOM | QIJB - 6 | BOTTOM |
|
|
| (2159 mm) |
|
| ||||||
|
|
|
|
|
|
| Bottom |
| |
| 8’0” 4 SECTIONS | QIJB - 3 | MIDDLE | QIJB - 6 | TOP | QIJB - 7 | MIDDLE |
| |
| hole |
| |||||||
| 88” TRACK (2235 mm) |
| |||||||
|
|
|
|
|
|
|
| ||
| 8’0” 5 SECTIONS | QIJB - 3 | BOTTOM | QIJB - 7 | TOP | QIJB - 8 | TOP |
|
|
| 88” TRACK (2235) | quick install feature |
| ||||||
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
5 |
| Left Hand TORQUEMASTER® |
|
Drums | counterbalance DRUM | #1 End Hinge | |
| |||
|
| (hinge tube) | |
Tools Needed: | IMPORTANT: Right and left hand is |
|
|
always determined from inside the |
|
| |
None |
|
| |
building looking out. |
|
| |
|
|
| |
| NOTE: For door section identification see | BOTTOM |
|
| SECTION |
| |
| page 4. | Counterbalance | BOTTOM |
|
| ||
|
| SECTION | |
| TorqueMaster® counterbalance drums | cable | |
|
| ||
| are marked right and left hand. Uncoil the |
|
|
| counterbalance cables and make sure you |
|
|
| place the right hand cable loop on the right |
| Rollers |
| hand milford pin and place the left hand |
| |
|
|
| |
| cable loop on the left hand milford pin. |
|
|
| Insert a roller into bottom bracket of the |
|
|
| bottom section and insert another roller | MILFORD PIN | bottom bracket |
| at #1 end hinge at the top of the bottom |
| |
|
|
| |
| section. Repeat for other side. |
| BOTTOM |
| NOTE: Verify astragal (bottom seal) is |
| |
|
| SECTION | |
| aligned with door section. If there is more | astragal |
|
| than 1/2” excess astragal on either side, |
|
|
| trim astragal even with door section. |
|
|
|
|
| 13 |
INSTALLATION
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at