Mitsubishi Electronics SDP-ECO 1630 III manual List of expendable parts, How to order parts

Page 73

Chapter 7 Maintenance

7.8 List of expendable parts

Note

Parts name

Parts code

Unit

When to replace

 

 

 

 

NT cutter blade

200400107

1 set (contains 10 blades)

After cutting

two plate rolls.

 

 

 

Pump unit (EAC)

U1105011

1 set

After completing 25000

prepress processes.

Pump unit (EST)

U1105012

1 set

After completing 25000

prepress processes.

 

 

 

-After 25000 prepress processes, a "Pump Check" message appears on the display panel when the power switch is turned ON.

This indicates that it is time to replace the pump, so please contact the serviceman and request a pump replacement.

Always replace the pump units for EAC and EST at the same time.

Clear this panel display by pressing the RESET key and continue the initial inspection.

-Average lifetime varies depending on the usage condition (input voltage, ambient environment, temperature, humidity, and daily maintenance).

-When expendable parts noted in the list must be replaced, customers will be charged for labor and parts costs even if the equipment is still within its warrantee period.

7.9 How to order parts

The SDP-Eco 1630 III has many parts, some of which users can replace on their own and some which require service personnel to replace. If you wish to order any parts, please do the following:

(1)Indicate whether you just need the parts, or whether you need to have them replaced by service personnel.

(2)Information from your warranty or machine name plate

i)Model: SDP-Eco 1630 III

ii)Serial number

(3)Names and numbers of necessary parts, quantities, date required

Caution

-Please be aware that new models may be developed and specifications may change without notice, so parts may differ from those listed in this

operation manual.

-Mitsubishi Paper Mills Ltd. takes no responsibility for improvements users may undertake on their own or in collaboration with another company.

- 65 -

Image 73
Contents Page III For Your Safety Compliance with Cispr Rules When export the machineCompliance with FCC Rules Limit of responsibilityIntroductory Note About this manual Contents Menus and panel displays When using the machine On SafetyPower supply Maintenance and safe passage during emergenciesSafety switches This machine incorporates a power supply unitSDP-Eco 1630 III is equipped with a leakage circuit breaker This machine incorporates high current electrical circuitsFor European model Hazard Safe handling method Types of warning labelsLocations of the machines warning labels are shown below Handling processing chemicals Processing chemical components Power cables Before connecting the power cableUnacceptable Operation precautionsSDP-Eco 1630 III Installation Precautions during transport and installationTransport and installation Installation environmentVentilation Installation space MaintenanceMachine disposal Page Main unit Names of Machine Components and PartsPage Operation panel Safety switch Handling plates Plate settingTwo set screws are Refer to 4.1 Cable Insert the plate edge until Plate end processing Page Cable connection check OperationInitialization Turning on the power switchPanel display flow after machine startup Press the Menu Key to display Amount using the key or Key and register the value with Remote exposure ExposureLocal exposure Exposure Preparing and pouring processing chemical Processor sectionProcessing chemical replenishment Preparing rinse water Processing chemical replacementIf the machine is not used for a long period Handling waste liquidCollecting exposed plates Turning OFF the power supply and inspection at shutdownOperation Page User menu Menus and panel displaysOperation status Remote mode display Power ON/OFF keyMenu/command selection Panel operationShift between commands Example Switch the mode between remote and localCommand execution Plate data User menuData channel Plate typeLaser setting Resolution settingLaser menu Remaining amount of plateLaser test exposure Punch specifications Mode menuPre. Feed menu Image Data menuRinse Maintenance menuKey Procedure In cases where the current values are changed toCutter blade replacement MaintenanceReplacement procedure Dust, clean it off with a blower Cylindrical lens cleaningFilter cleaning Punch dust removal Resetting the punch counter Cleaning the processor sectionCleaning the processor rack Processor rack Stay Re-attach the supply guides to the processor rack Cleaning the processing chemical tank and filterCleaning the processing chemical supply pipe Cleaning the nip roller and exit roller Upper Cleaning the exit roller lower Set screw Roller fixing bracket Washing tank Bearing for a roller Exit roller lower Cleaning the washing tank Left tray rail Set screw Around when you remove the hose Slide the washing tank Replacing the diffusion sheet SLM-EAC, SLM-EST Put the accompanying diffusion List of expendable parts How to order partsMonth Year SDP-Eco 1630 III Maintenance and Inspection Chart Message Displaying and clearing errorsMessage Message Operation status Status displayMessage Error contents List of error messagesME9 Removing Plate jam 1 Jam removal procedureRemoving Plate jam Basic specifications SpecificationsOverview diagram Silver Digiplater