4.2 Turning ON the power switch
Before you turn ON the power switch of the main unit, check the following points.
1)Processing chemical has been properly supplied to the processor.
2)The front door and plate setting cover are securely closed and the covers are properly mounted.
Caution
In a SCSI, the power switch must be turned ON from the peripheral unit. First, check that the power switch for the host computer (RIP computer) is shut down. Then, turn ON the machine power switch.
Note
If any error is detected during initialization after turning ON the power switch, it is immediately displayed.
4.3 Initialization
When the power switch to the
-Internal setting check
-Plate mounting check
-Polygon mirror function check
-Waste chemical tank level check
-Activator (EAC) level check
-Stabilizer (EST) level check
-Home position check for each moving part
•Panel display flow after machine startup
Initializing.... | Levels | Dryer H/L? | Cleaning |
Cleaning | Heating | Start OK |
Note
-You can cancel the operations after "Cleaning", during the sequence of this
process, by using the key.
-The "Heating" window informs you if a heater has not yet reached the specified temperature. ("P" signifies the process heater, and "R", the roller heater.)
- 26 -