Month | Year |
| Supervisor |
|
|
ItemProcedure
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Period Day
III
- 66 -
NT cutter blade
Cylindrical lens
Filter cleaning
Optional punch unit
Processor section cleaning
Washing tank cleaning
Processing chemical tank cleaning and chemical replacement
Replace the blade following the noted replacement procedure.
Blow the dust and dirt off the lens with a blower. (Be careful not to scratch the lens.)
Remove the filter and clean it.
Discard the punch dust. (An alert message appears after every 1000 punches.
Thoroughly read the instruction manual.
Thoroughly read the instruction manual.
Thoroughly read the instruction manual.
As necessary
Every three months.
As necessary
Every three months.
Every one month
Every three months or after processing 1000m2 of plates
USERS MANUAL
Processing chemical supply pipe cleaning
Upper and lower exit roller and rinse water nip roller cleaning
Rinse water
Thoroughly read the instruction manual.
Thoroughly read the instruction manual.
Thoroughly read the instruction manual.
Every three months
Every month or after processing 1000 plates
Every day
1. Please read the instruction manual carefully. 2. Mark the date when the inspection is performed. 3. Copy this sheet and use this same form every month.