Chapter 7 Maintenance
-Before securing the washing tank, lift the near end of the tank and Caution its retainer as high up as possible
-Securely tighten the set screws using a coin.
Slit
Left tray rail
19)Plug the removed hose back into the tube connector.
20)Insert the back of the left tray rail into the slit in the guide plate.
21)Secure the left tray rail with set screws.
7.7 Replacing the diffusion sheet (SLM-EAC, SLM-EST)
Processing chemical supply guide
Processing chemical supply guide
Processor rack
1)Remove the processing chemical supply guides from the processor rack.
2)Loosen the two set screws for each processing chemical supply guide to remove the diffusion sheet.
- 63 -