2. Releasing the plunger handle
Plunger Handle
During transport, fit the plunger handle into the deep slot.
NOTE: This position is not be used for any cutting operation.
English
During operation fit the plunger handle stoppers into the shallow slot.
Plunger Handle
Clockwise
Pull out to disengage. Rotate the knob 1/4 turn and fit the pin stoppers into the shallow slot.
Fig. | Fig. |
When the power tool is prepared for shipping, its main parts are secured by a plunger handle. Move the handle slightly so that the plunger handle can be disengaged and adjusted as indicated in Fig.
NOTE: Lowering the handle sloghtly will enable you to disengage the plunger handle more easily and safely.
The lock position of the plunger handle is for carrying and storage only.
For transportation purpose, grasp the handle (see Fig. 1) with one hand and hold the base at the left end grip section with the other hand to carry.
3. Installing the dust bag, miter handle, extension wing, stock stop and vises.
(The extension wing and stock stop are optional accessories).
Attach the dust bag, miter handle, extension wing, stock stop and vise assembly as indicated in Fig. 1 and Fig. 2.
(1) Assembly of clamp lever
qInsert spring and screw into the hole of the clamp lever as shown in Fig. 6.
Clamp HandleCollar
Lever
Screw Spring
Fig. 6
wAssemble the clamp lever to the handle collar, then tighten the screw as shown in Fig. 7.
Screw
Clamp Lever
5 mm Hex. soc. hd. cap bolt (C) (Stopper for 0°)
Fig. 7
4.Installing the extension stay
(1)Insert the extension stay into the hole of the base.
(2)Fasten the two 5 mm machine screws and fix an extension stay as indicated in Fig. 2.
11