Fluke 7350 specifications Powering Up the Ruska, Pneumatic Connections, Drive Air Supply Port

Page 24

RUSKA 7350

Users Manual

W Caution

If there is any condensation, the RUSKA 7350 must be thoroughly dried before power is applied.

Cautions

The following cautions should be heeded at all times to insure safe operation of the RUSKA 7350.

WX Warning

Never operate the unit with the cover removed. The power supply has internal voltages near 400 volts.

Never apply more than 110% of the unit’s full scale pressure range to the test port. Never try to control while a pressure source is connected to the test port.

Avoid thermal and mechanical shock to the instrument. This will affect performance and require re-zeroing.

Powering Up the RUSKA 7350

1.First, plug the power cord supplied with the RUSKA 7350 into the power connector on the RUSKA 7350’s back panel.

Note

Grounding for the RUSKA 7350 is provided through the power cord.

2.Next, plug the power cord into a receptacle rated for either 100 – 120 VAC

or 220 – 240 VAC (check name plate). If a different power cord is necessary for your receptacle, consult Table 1-1 for available power cords.

3.Finally, turn on the RUSKA 7350 by flipping the POWER switch on the back panel. The MEASURE screen will appear on the color display, and the front panel will be fully operational.

Pneumatic Connections

Pneumatic connection to the RUSKA 7350 is straightforward. The following sections discuss each port.

Drive Air Supply Port

The air supply port must be connected to a well regulated source of dry shop air. Air supply should be 100 – 110 psi (7 – 7.5 bar). Supply port is a 1/4 NPT female connection.

Test Port

The test port is designed to control a wide range of volumes. Any leaks on the test port will cause measurement errors. For best results, a volume of approximately 3 in3 (50 cc) is recommended. The test port is 1/8 NPT female.

Gas Supply Port

The gas supply port should be connected to a clean, dry gas supply with a pressure of 110% of full scale pressure. The port is 1/8 NPT female.

3-2

Image 24
Contents Ruska Limited Warranty and Limitation of Liability Table of Contents Theory of Operation Remote Operation Preparation for Storage and Shipment List of Tables Ruska List of Figures Viii How to Contact Fluke General InformationIntroduction General InformationSafety Information Symbols Used in this Manual FeaturesPower-On Self Test Automatic Zero AdjustEase of Operation Easily ProgrammableStandard Equipment & Options Ruska 7350 Options List Part NumberRuska Power Supply Theory of OperationElectronics Section Back Plane BoardRuska 7350 Block Diagram IEEE-488 Interface Front PanelMotor Controller Pneumatic Module 76xx Interface BoardPneumatic Pump GearmotorElectronics Regulator Dome RegulatorSystem Transducer Test PortRuska Installation Unpacking the RuskaPowering Up the Ruska Pneumatic ConnectionsDrive Air Supply Port Local Operation Local OperationNumeric Keypad Function KeysCancel, Previous Menu TreeTutorial Main MenuMain Menu Entering Pressure Selecting Mode of Operation Tare ModeSelecting Language Setting the Pressure Set-Point Main MenuControlling Pressure Triple Range OptionalVent Step/JogMenu Setup MenuMenu Setup Limits High LimitLow Limit Auto VentControl Band Access Menu Setup UserSlew Rate Slew LimitStep Size Bar Graph MaximumReady Tolerance Gas Head Pressure CorrectionMenu Setup Units Pressure FilterChanging the Number of Decimals Key Click13. Menu Setup Units Edit Name Menu Menu Setup Remote Menu Setup SystemGpib Address ProtocolReset Calibration PasswordDate/Time Menu CalibrateMenu Program Storing a Sequence in Memory Preparing to ProgramMode of Entry MaxTimeEntering a New Program 17. Menu Program Edit Menu Automatically Generating a Program 18. Menu Program Edit Auto MenuChanging the Name of a Program Changing an Existing ProgramChanging the Configuration Stored with a Program 20. Menu Program Edit Menu21. Menu Program Config Menu Running a ProgramMenu Test Menu Test Sweep TestMenu Test Self Test Menu Test Remote TestMenu Test Shop1 26. Menu Test Shop1 MenuMenu Display Menu Display BlankRuska Remote Operation Remote OperationCapabilities IEEE-488Remote/Local Operation RS-232Configuration Scpi Command FormatDevice Messages Scpi Response FormatANSI/IEEE 488.2-1987 Command Summary Scpi Command SummaryMODE? Example Scpi Commands ListScpi Status Registers Interface Panel Emulation Serial Operation Ruska Maintenance Preventive MaintenanceObserving the Ruska 7350’s Full Scale Rating Observing the Software Version NumberProcessor Battery CalibrationCalibration Instructions Single Sensor PreparationStoring the Coefficients Editing the Calibration Coefficients ZeroingCleaning Ruska 7350 Pump LubricationFuse Preparation for Storage and Shipment Disconnection InstructionsPacking Instructions Fluke Calibration Westpark Drive HOUSTON, TX USA Shipping Instructions Packing the Calibrator7350 Summary of Specifications AccuracySpecifications Summary of Specifications Ruska Summary of Error Messages Summary of Error MessagesSetpoint is out of range