Carrier 48FK, JK034-074 Carrier Default Program Parameter Values, Parameter Group Default Value

Page 53

Table 29 Ð Carrier Default Program Parameter Values

PARAMETER GROUP

PARAMETER

DEFAULT VALUE

 

ACC1

60.0 Sec

 

DEC1

60.0 Sec

 

UL

60.0 Hz

 

LL

10.0 Hz*

 

Luln

1

 

P3

20%

SEtP

F-P3

0.0 Hz

(Setup)

P4

100%

 

F-P4

60 Hz

 

tHr1

See Table 31

 

StC1

0

 

StL1

110%

 

OLN

1

 

tYP

5*

Gr.F

FH

60 Hz

(Fundamental)

Pt

2

 

FbP1

1*

 

Fbln

2

 

GP

.30

 

Gl

2 sec

Gr.Fb

GA

0

(Feedback)

GFS

80

 

P1LL

10

 

PuL

1

 

PuUl

10

 

PuLL

10

Gr.SF

Fsor

60 Hz

Sr.n

1* (054-104 only)

(Frequency Settings)

SrN1

0* (054-104 only)

 

Gr.Pn

Fr

0*

(Panel Control)

 

 

 

1t

1

 

1t0

0

Gr.St

1t1

56

(Terminal Selection)

1t2

13

 

1t3

3

 

1t4

10

Gr.Pr

UuC

1*

UuCt

2

(Protection)

ArSt

3

 

 

Cnod

1*

Gr.Ut

bLSF

1* (054-104 only)

(Utility)

Fnod

2*

 

bLPn

1*

*These settings differ from the Toshiba defaults and are required for Carrier applications.

NOTE: To restore original factory settings, change tYP to 6 in Setup mode (SetP). This restores the VFD original factory settings.

53

Image 53
Contents Contents Controls Operation TroubleshootingGeneral Safety ConsiderationsConnector J1 Temperature Unit Size Terminal no Input Pin Terminal Connector J1 Thermistor InputsDIP EXVConnector J2 Status Switch Unit Size Terminal no Status Switch Inputs034-104 RNT Ð ReturnPage Output PIN Name Rating Device Terminal Output Pin and Terminal AssignmentsHIR IFCCompressor Operation Thermistor T1 Location, 50FK,JK034-048 Units Thermistor T1 Location, 50FK,JK054-074 Units Thermistor T2 Location, Size 034-048 Units Thermistor T3 and T4 Locations, Size 054-104 Units Input Integrated CircuitSpace Temperature Reset Controls InstallationUnit Control Box Arrangement, Sizes Unit Control Box Arrangement, Sizes Unit Control Box Arrangement, Sizes 088 Thermistor Resistance Voltage Drop CharacteristicsSpace Temperature Sensor Averaging Single-Step Demand Limit MSP = Sasp + Remote Sasp Wiring Smoke Control Modes Smoke Control Switches Required for Each ModeTubing Size Switch FunctionsTerminal Block DPS Ð Differential Pressure SwitchSwitch START-UP Modulating Power Exhaust Differential Pressure Switch SizesConguration Header Jumpers Conguration Header DIP Switch Factory SettingsPotentiometer Inputs and Ranges Switch Function Meaning Position DIP SwitchesInlet Guide Vane Motor 50FK,JK034-074 Units Variable Frequency Drive Keypad Jumper Removal to Disable MotorChanging the VFD Set Point Frequency Command VFD Set Point Frequency Command for Duct PressureControl Signal Pressure VFD SET Point PressureStart Unit Quick Normal Description Control Switch Test Display Step no Quick Test, Unit Conguration and Switch CheckQuick Test, Output Relay Check Quick Test, Thermistor and Potentiometer CheckQuick Normal Description Thermistor or Test Quick Normal Test Description Relay NumberSensor Resistance Values Operating InformationPage Component Arrangement, 034-048 Units Component Arrangement, 054-104 Units Page Modulating Power Exhaust Component Locations Sizes Modulating Power Exhaust Component Locations Sizes Page Compressor Loading and Unloading Sequences Cooling Size 064 Units Cooling Size 054 UnitsCooling Size 088 Units Cooling Size 104 UnitsControls Troubleshooting TroubleshootingSymptoms Probable Causes Solutions Operation Status CodesDiagnostic Codes Codes 71 to 76 THERMISTOR/RESISTOR Failure Page Test PIN Voltage DC TP3 Terminals Voltage ACTP4 TP6PIN Terminal Voltage DC Quick Test J9 PIN Numbers Step noPin Terminal Connector J2 Voltages Pin Terminal Connector J1 VoltagesTerminal Strip J6 Connection Resistance Reading PIN Voltage TerminalQuick Test J5 PIN Numbers Step no Terminal Strip J5 Connector Resistance ReadingEnthalpy Sensor Checkout Variable Frequency Drive Parameter Group Default Value Carrier Default Program Parameter ValuesMotor Overload Settings Required User Adjusted DefaultsLAT ALMLPS MTRPage Page Call for Free Catalog Service TrainingPRE-START-UP II. Preliminary Checklist ItemsIV. Notes III. START-UP