Burnham
1100-H4
manual
Install
XI. Repair Parts
How to Wire
Warranty
Dimension
Joint Assembly Instructions
IX. Service
Page 44
Figure 22: Optional Separate Horizontal 4” Vent Terminal Installation (Indoor Air)
44
Page 43
Page 45
Image 44
Page 43
Page 45
Contents
SCG
8140705R9-10/08 Price $5.00
Important Information Read Carefully
Page
Table of Contents
Dimensions
Pre-Installation
II. Unpack Boiler
Do not drop boiler. Do not bump boiler jacket against floor
III. Venting / Air Intake Piping
Required See Section
Vent/Air Intake Length
Vent System Components Included with Boiler
Burnham Vent System and Air Intake System Components
Vent Guidelines Due to Removal of an Existing Boiler
General Guidelines
Install Vent Pipe, Burnham Gasketed Vent System
Burnham Gasketed Vent Joint Detail
Vent Piping
Recommended Separate Horizontal Vent/Air Intake Installation
Alternate Separate Horizontal Vent/Air Intake Installation
Page
Page
Separate Vertical Venting System See Figures 6, 7, 8A, 8B
Page
Vertical Vent Installation
Page
Page
Vertical Air Intake Piping
Install Combination Vent/Air Terminal. See Figure
Combination Horizontal Vent System Components
Install Air Intake Piping. See Figures 10
Non-corrosive fasteners must be used
Combination Horizontal Vent/Air Installation SCG-3 thru
Page
Description Part Number SCG-3 & SCG-4
Combination Vertical Vent System Components
Clearances to Combustibles
Pre-Installation Considerations
General Installation Requirements
Page
Joint Assembly Instructions
Inner pipe is always cut 1 longer than the outer pipe
Condensate Drains
Horizontal Supports
Page
Fire Stop/Wall Thimble/Support, SC FS
Tall Cone Flashing Directly On Roof or Curb
Page
Horizontal
Recommended Separate Horizontal Vent Installation
Alternate Separate Horizontal Vent Installation
Optional Indoor Air Vent Terminal Installation
Install vent piping
Optional Separate Horizontal 3 Vent Terminal Installation
Optional Separate Horizontal 4 Vent Terminal Installation
Page
IV. Water Piping and Trim
Lwco Location
How to Wire
How to Test
Supply Water Manifold Piping
Page
Page
Gas Piping
Valves Fully Open
Page
VI. Electrical
Internal Boiler Wiring Schematic Diagram
Internal Boiler Wiring Ladder Diagram
System Controls and Wiring
System Wiring Schematic for Single Zone Space Heating Only
Page
Circulator Zoned System Wiring Schematic
Zone Valve Zoned System Wiring Schematic
Page
Modular Boiler Water Manifold Sizing
VII. Modular Installation
Do not manifold vent pipes together
Modular Boiler Gas Piping
VIII. System Start-up
Operating Instructions
Yellow led flame codes
Operating Instructions
Ignition Module Terminal CROSS-REFERENCE
Green Led status codes
Honeywell Electronic Ignition Troubleshooting Guide
Sequence of Operation
Gas Flow Rate in Cubic Feet Per Hour
Adjust gas input rate to boiler
Check limit
IX. Service
Low water cutoff if so equipped
Silicone Tubing Assembly
Pilot Burner Location
Flue and Burner Cleanout, 1 Burner
Main Burners and Firebox
Procedure for Measuring Differential Pressure See Figure
Differential Pressure Switch Settings
This page Left Intentionally Blank
Page
Page
XI. Repair Parts
Casting Assembly
Page
Base Assembly
Page
Base Enclosure Assembly
Page
FAN/CANOPY Assembly
Page
Burner Assemblies
Page
Control Panel Assembly
Page
Jacket Parts
Miscellaneous Parts Carton
Avoid Breathing Fiber Particulates and Dust
Service Record
Service Record
Limited Warranty
Related pages
Troubleshooting for Maytag W10239463A
Specifications for Samsung BD-C6800/EDC
Fixed Disk Drive Test Error Codes for Compaq 1850R
Trouble Chart for Strong Enterprises 48057
Road Map for ‘How to Get There From Here’ for NETGEAR WPN511
EmergeTM DM2000 Desktop Manager Installer/User Guide for Avocent DM2000
Parts List for Life Fitness FIT SERIES
Language Code List for JVC HR-XVC32SUJ
Displaying BD Bluetooth Device address for Pioneer P4100UB
Table below contains optional power cables for each country for Plasmon LF6600
Is there a dedicated hardware multiplier in the PicoBlaze as per
UG129
?
Top
Page
Image
Contents