Burnham 1100-H4 manual Operating Instructions, Ignition Module Terminal CROSS-REFERENCE

Page 66

H.Operating Instructions.

1.Follow Operating Instructions to place boiler in operation. See Figure 36.

2.Electronic Ignition Modules with LED indicators. Table 10 cross-references the ignition module terminal designations to the ignition terminal

numbers in the wiring ladder diagrams. The yellow LED indicates the status of the flame, see Table 11. The green LED indicates the status of the system, see Table 12. See Figure 37 for LED locations. See Figure 38 for Troubleshooting Guide.

TABLE 10: IGNITION MODULE TERMINAL

CROSS-REFERENCE

 

Ignition Module

Wiring Ladder Diagram

 

Terminal Designation

Terminal Number

 

MV

1

 

 

 

 

MV/PV

2

 

PV

3

 

GND

4

 

 

 

 

24V (GND)

5

 

 

 

 

24V

6

 

 

 

Figure 37: LED Locations

SPARK

9

TABLE 11: yellow led flame codes

Yellow LED

Indicates

Recommended Service Action

Flash Codea

 

 

 

Heartbeat

Normal Flame Signal

N/A

 

 

 

 

Weak Flame Signal -

 

 

System will operate reliably but flame signal is

 

2

less than desired.

Perform routine maintenance to

Note: This indication may flash temporarily

assure optimum flame signal.

 

 

during or shortly after lightoff on some appli-

 

 

cations.

 

 

Marginal Flame Signal (less than 1.1 µA) -

 

 

System may not operate reliably over time.

Check gas supply, pilot burner, flame

 

Service call recommended.

1

sense wiring, contamination of flame

Note: This indication may flash temporarily

 

rod, burner ground connection.

 

during or shortly after lightoff on some appli-

 

 

 

cations.

 

 

No Flame or Flame Signal -

 

OFF

below minimum threshold for system

N/A

 

operation.

 

aFlash Code Descriptions

-Heartbeat: Constant ½ second bright, ½ second dim cycles.

-The flash code number signifies that the LED flashes X times at 2Hz, remains off for two seconds, and then repeats sequence.

66

Image 66
Contents SCG 8140705R9-10/08 Price $5.00Important Information Read Carefully Page Table of Contents Dimensions Pre-Installation II. Unpack Boiler Do not drop boiler. Do not bump boiler jacket against floorIII. Venting / Air Intake Piping Required See SectionVent System Components Included with Boiler Burnham Vent System and Air Intake System ComponentsVent/Air Intake Length Vent Guidelines Due to Removal of an Existing Boiler General GuidelinesInstall Vent Pipe, Burnham Gasketed Vent System Burnham Gasketed Vent Joint DetailVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Combination Horizontal Vent System ComponentsInstall Air Intake Piping. See Figures 10 Non-corrosive fasteners must be usedCombination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 Combination Vertical Vent System ComponentsPre-Installation Considerations General Installation RequirementsClearances to Combustibles Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Fire Stop/Wall Thimble/Support, SC FS Tall Cone Flashing Directly On Roof or CurbPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim Lwco LocationHow to Wire How to TestSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page VII. Modular Installation Do not manifold vent pipes togetherModular Boiler Water Manifold Sizing Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Operating Instructions Ignition Module Terminal CROSS-REFERENCEYellow led flame codes Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Adjust gas input rate to boiler Check limitGas Flow Rate in Cubic Feet Per Hour IX. Service Low water cutoff if so equippedSilicone Tubing Assembly Pilot Burner LocationFlue and Burner Cleanout, 1 Burner Procedure for Measuring Differential Pressure See Figure Differential Pressure Switch SettingsMain Burners and Firebox This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty