Burnham 1100-H4 manual Main Burners and Firebox, Differential Pressure Switch Settings

Page 74

E.Main Burners and Firebox.

1.Vacuum firebox. Exercise care - do not damage base insulation.

2.Clean main burners. Brush top of burners with soft bristle brush. See Figure 44. Vacuum to remove any dirt and lint.

3.Vacuum tip of pilot burner.

4.Check gas orifices for lint and dirt. Clean as necessary.

5.Install main burners by reversing procedure to remove burners.

a.Pilot burner must be installed in original location. See Table 14.

b.Main burners must be properly secured in burner tray slot at rear of firebox and over gas orifice.

See Figure 44.

c.Pilot gas supply and pilot lead wires must be reconnected.

d.Burner access panel must be securely in place.

e.Reinstall air diffuser screen.

f.Reconnect Flame Roll-out wires.

g.Air Intake Box Front Door must be installed.

F.Check operation. Follow steps G through P from Section VIII: System Start-up.

G.Procedure for Measuring Differential Pressure (See Figure 45).

1.With boiler off, remove Gray and Black Hoses at differential pressure switch.

2.With tees and ¼ inch aluminum stubs, connect water manometer as shown with additional tubing.

3.Start boiler and read Pressure on Manometer when boiler water temperature reaches operating temperature. Refer to Table 15 for minimum readings.

Table 15: Differential Pressure Switch Settings

NOTE: If switch drops-out before boiler reaches temperature or if pressure differential readings are below minimums shown in Table 15, check for cracks in hose or contact your nearest Burnham representative.

4.Stop boiler, remove manometer and reconnect hoses to differential pressure switch. See Figures 42 and 45.

Figure 45: Differential Pressure Measurement

Boiler Model

Minimum Differential Pressure

 

 

Sea Level to 4,999 Ft.

5,000 - 10,000 Ft. Elevation

 

 

 

 

SCG-3

1.32” w.c.

.80” w.c.

 

 

 

SCG-4

1.17” w.c.

.65” w.c.

 

 

 

SCG-5

1.17” w.c.

.65” w.c.

 

 

 

SCG-6

.88” w.c.

.35” w.c.

 

 

 

SCG-7

.80” w.c.

.30” w.c.

 

 

 

SCG-8

.88” w.c.

.35” w.c.

 

 

 

SCG-9

.88” w.c.

.35” w.c.

74

Image 74 Contents
SCG 8140705R9-10/08 Price $5.00Important Information Read Carefully Page Table of Contents Dimensions Pre-Installation II. Unpack Boiler Do not drop boiler. Do not bump boiler jacket against floorIII. Venting / Air Intake Piping Required See SectionVent/Air Intake Length Vent System Components Included with BoilerBurnham Vent System and Air Intake System Components Vent Guidelines Due to Removal of an Existing Boiler General GuidelinesInstall Vent Pipe, Burnham Gasketed Vent System Burnham Gasketed Vent Joint DetailVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Combination Horizontal Vent System ComponentsInstall Air Intake Piping. See Figures 10 Non-corrosive fasteners must be usedCombination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 Combination Vertical Vent System ComponentsClearances to Combustibles Pre-Installation ConsiderationsGeneral Installation Requirements Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Fire Stop/Wall Thimble/Support, SC FS Tall Cone Flashing Directly On Roof or CurbPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim Lwco LocationHow to Wire How to TestSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Modular Boiler Water Manifold Sizing VII. Modular InstallationDo not manifold vent pipes together Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Yellow led flame codes Operating InstructionsIgnition Module Terminal CROSS-REFERENCE Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Gas Flow Rate in Cubic Feet Per Hour Adjust gas input rate to boiler Check limit IX. Service Low water cutoff if so equippedSilicone Tubing Assembly Pilot Burner LocationFlue and Burner Cleanout, 1 Burner Main Burners and Firebox Procedure for Measuring Differential Pressure See FigureDifferential Pressure Switch Settings This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty