Burnham 1100-H4 manual Base Enclosure Assembly

Page 83

Key

Description

 

 

[Quantity] Part Number

 

 

 

 

 

 

 

 

 

 

 

No.

SCG-3

SCG-4

SCG-5

 

SCG-6

 

SCG-7

SCG-8

SCG-9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. BASE ENCLOSURE ASSEMBLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3A

Air Box Assembly

61807032

61807042

61807052

 

61807062

 

61807072

61807082

61807092

 

 

 

 

 

 

 

 

 

 

 

3B

Air Box Door

71807034

71807044

71807054

 

71807064

 

71807074

71807084

71807094

 

 

 

 

 

 

 

 

 

 

 

3C

Combustion Air Diffuser

N/A

71807049

71807059

 

71807069

 

71807079

71807089

71807099

 

 

 

 

 

 

 

 

 

 

 

3D

Pilot Tube Gasket Cover Plate

 

 

 

7096002

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3E

Pilot Tube Gasket

 

 

 

8206038

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3F

Window Plug

 

 

 

102202-01

 

 

 

 

 

 

 

 

 

 

 

 

 

3J

Sheet Metal Screws #8 x 1/2”

 

 

 

(6) 80860000

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3K

Self Tapping Screw, 10-32 x 3/8”

(18) 80860705

 

 

 

(22) 80860705

 

 

 

 

 

 

 

 

 

 

 

 

83

Image 83
Contents 8140705R9-10/08 Price $5.00 SCGImportant Information Read Carefully Page Table of Contents Dimensions Pre-Installation Do not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerRequired See Section III. Venting / Air Intake PipingVent/Air Intake Length Vent System Components Included with BoilerBurnham Vent System and Air Intake System Components General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Combination Horizontal Vent System Components Install Combination Vent/Air Terminal. See FigureNon-corrosive fasteners must be used Install Air Intake Piping. See Figures 10Combination Horizontal Vent/Air Installation SCG-3 thru Page Combination Vertical Vent System Components Description Part Number SCG-3 & SCG-4Clearances to Combustibles Pre-Installation ConsiderationsGeneral Installation Requirements Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page Lwco Location IV. Water Piping and TrimHow to Test How to WireSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Modular Boiler Water Manifold Sizing VII. Modular InstallationDo not manifold vent pipes together Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Yellow led flame codes Operating InstructionsIgnition Module Terminal CROSS-REFERENCE Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Gas Flow Rate in Cubic Feet Per Hour Adjust gas input rate to boilerCheck limit Low water cutoff if so equipped IX. ServicePilot Burner Location Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Main Burners and Firebox Procedure for Measuring Differential Pressure See FigureDifferential Pressure Switch Settings This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty