4.All above ground gas piping upstream from manual shut-off valve must be electrically continuous and bonded to a grounding electrode. Do not use gas piping as grounding electrode. Refer to National Electrical Code, NFPA 70.

C.Pressure test. The boiler and its gas connection must be leak tested before placing boiler in operation.

1.Protect boiler gas control valve. For all testing over ½ psig, boiler and its individual shutoff valve must be disconnected from gas supply piping. For testing at ½ psig or less, isolate boiler from gas supply

piping by closing boiler’s individual manual shutoff valve.

2.Locate leaks using approved combustible gas detector, soap and water, or similar nonflammable solution.

DANGER

Do not use matches, candles, open flames or other ignition source to check for leaks.

52

Image 52
Contents SCG 8140705R9-10/08 Price $5.00Important Information Read Carefully Page Table of Contents Dimensions Pre-Installation II. Unpack Boiler Do not drop boiler. Do not bump boiler jacket against floorIII. Venting / Air Intake Piping Required See SectionBurnham Vent System and Air Intake System Components Vent System Components Included with BoilerVent/Air Intake Length Vent Guidelines Due to Removal of an Existing Boiler General GuidelinesInstall Vent Pipe, Burnham Gasketed Vent System Burnham Gasketed Vent Joint DetailVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Combination Horizontal Vent System ComponentsInstall Air Intake Piping. See Figures 10 Non-corrosive fasteners must be usedCombination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 Combination Vertical Vent System ComponentsGeneral Installation Requirements Pre-Installation ConsiderationsClearances to Combustibles Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Fire Stop/Wall Thimble/Support, SC FS Tall Cone Flashing Directly On Roof or CurbPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim Lwco LocationHow to Wire How to TestSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Do not manifold vent pipes together VII. Modular InstallationModular Boiler Water Manifold Sizing Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Ignition Module Terminal CROSS-REFERENCE Operating InstructionsYellow led flame codes Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Check limit Adjust gas input rate to boilerGas Flow Rate in Cubic Feet Per Hour IX. Service Low water cutoff if so equippedSilicone Tubing Assembly Pilot Burner LocationFlue and Burner Cleanout, 1 Burner Differential Pressure Switch Settings Procedure for Measuring Differential Pressure See FigureMain Burners and Firebox This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty