Burnham 1100-H4 manual Green Led status codes

Page 67

Table 12: green Led status codes

Green LED

 

 

 

 

Flash Code

Indicates

Next System Action

Recommended Service Action

(X + Y)a

 

 

 

 

OFF

No “Call for Heat”

N/A

None

 

Flash Fast

Startup - Flame sense

N/A

None

 

calibration

 

 

 

 

 

Heartbeat

Normal operation

N/A

None

 

 

 

 

If system fails to light on next trial

 

5 minute Retry Delay-

 

for ignition check gas supply, pilot

 

Initiate new trial for ignition after retry

burner, spark and flame sense wir-

2

Pilot flame not detected

delay completed.

ing, flame rod contamination or out

 

during trial for ignition

 

 

of position, burner ground connec-

 

 

 

 

 

 

tion.

 

 

 

 

If system fails to light on next trial

 

Recycle- Flame failed

Initiate new trial for ignition. Flash

for ignition check gas supply, pilot

3

code will remain through the ignition

burner, flame sense wiring, flame

during run

 

trial until flame is proved.

rod contamination, burner ground

 

 

 

 

 

connection.

 

 

 

If situation self corrects within 10

Check for pilot flame. Replace gas

 

 

seconds, control returns to normal

 

Flame sensed out of

valve if pilot flame present. If no

 

4

sequence. If flame out of sequence re-

 

sequence

pilot flame, cycle “Call for Heat.”

If

 

 

mains longer than 10 seconds, control

error repeats, replace control.

 

 

 

goes to Flash code 6+4 (see below)

 

 

 

 

 

 

 

 

Check flame sense lead wire for

 

 

Flame sense leakage to

Control remains in wait mode. When

damage or shorting. Check that

 

7

the fault corrects, control resumes nor-

flame rod is in proper position.

 

ground

 

 

mal operation after a one minute delay.

Check flame rod ceramic for cracks,

 

 

 

 

 

damage or tracking.

 

 

 

Control remains in wait mode. When

Check transformer and AC line for

 

Low secondary voltage

proper input voltage to the control.

8

the fault corrects, control resumes nor-

 

supply- (below 15.5 Vac)

mal operation after one minute delay.

Check with full system load on the

 

 

 

transformer.

 

 

5 minute Retry Delay-

 

Check gas supply, pilot burner, spark

 

Initiate new trial for ignition after retry

and flame sense wiring, flame rod

6 + 2

On every third retry on

delay completed.

contamination or out of position,

 

 

same “Call for Heat”

 

 

 

burner ground connection.

 

 

 

 

 

 

On every 6th flame

5 minute retry delay, then initiate new

Check gas supply, pilot burner, flame

6 + 3

failure during run on the

sense wiring, contamination of flame

trial for ignition.

 

same “Call for Heat”

rod, burner ground connection.

 

 

 

 

 

Flame sensed out of

Control waits until flame is no longer

Check for pilot flame. Replace gas

 

sensed and then goes to soft lockout.

valve if pilot flame present. If no

 

6 + 4

sequence- longer than

 

Flash code continues. Control auto

pilot flame, cycle “Call for Heat.”

If

 

10 seconds

 

resets from soft lockout after one hour.

error repeats, replace control.

 

 

 

 

 

Soft lockout due to error

Control auto resets from soft lockout

Reset by cycling “Call for Heat.”

If

ON

detected during self

after one hour.

error repeats, replace the control

 

 

check sequences

 

 

 

 

 

aFlash Code Descriptions:

 

 

 

-Flash Fast: rapid blinking

-Heartbeat: Constant ½ second bright, ½ second dim cycles.

-A single flash code number signifies that the LED flashes X times at 2Hz, remains off for two seconds, and then repeats the sequence.

-X + Y flash codes signify that the LED flashes X times at 2Hz, remains off for two seconds, flashes Y times at 2 Hz, remains off for three seconds, and then repeats the sequence.

67

Image 67
Contents 8140705R9-10/08 Price $5.00 SCGImportant Information Read Carefully Page Table of Contents Dimensions Pre-Installation Do not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerRequired See Section III. Venting / Air Intake PipingBurnham Vent System and Air Intake System Components Vent System Components Included with BoilerVent/Air Intake Length General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Combination Horizontal Vent System Components Install Combination Vent/Air Terminal. See FigureNon-corrosive fasteners must be used Install Air Intake Piping. See Figures 10Combination Horizontal Vent/Air Installation SCG-3 thru Page Combination Vertical Vent System Components Description Part Number SCG-3 & SCG-4General Installation Requirements Pre-Installation ConsiderationsClearances to Combustibles Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page Lwco Location IV. Water Piping and TrimHow to Test How to WireSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Do not manifold vent pipes together VII. Modular InstallationModular Boiler Water Manifold Sizing Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Ignition Module Terminal CROSS-REFERENCE Operating InstructionsYellow led flame codes Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Check limit Adjust gas input rate to boilerGas Flow Rate in Cubic Feet Per Hour Low water cutoff if so equipped IX. ServicePilot Burner Location Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Differential Pressure Switch Settings Procedure for Measuring Differential Pressure See FigureMain Burners and Firebox This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty