Burnham 1100-H4 manual Casting Assembly

Page 79

Key

Description

 

 

[Quantity] Part Number

 

 

 

 

 

 

 

 

 

No.

SCG-3

SCG-4

SCG-5

SCG-6

SCG-7

SCG-8

SCG-9

 

 

 

 

 

 

 

 

 

 

 

 

1. CASTING ASSEMBLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

Section Assembly

61707031

61707041

61707051

61707061

61707071

61707081

61707091

 

 

 

 

 

 

 

 

 

1A

Left End Section

 

 

 

71707001

 

 

 

 

 

 

 

 

 

 

 

 

1B

Center Section

(1)

(2)

(3)

(4)

(5)

(6)

(7)

71707003

71707003

71707003

71707003

71707003

71707003

71707003

 

 

1C

Right End Section

 

 

 

71707002

 

 

 

 

 

 

 

 

 

 

 

 

1D

Slip Nipple, #3

(4)

(6)

(8)

(10)

(12)

(14)

(16)

806600009

806600009

806600009

806600009

806600009

806600009

806600009

 

 

1E

Flue Gas Baffle

(2)

(3)

(4)

(5)

(6)

(7)

(8)

71107002

71107002

71107002

71107002

71107002

71107002

71107002

 

 

1F

Tie Rod, ¼” -20

(2)

(2)

(2)

(2)

(2)

(2)

(2)

100109-01

100108-05

100108-07

100108-13

100108-14

100108-15

100108-16

 

 

1G

Hex Nut, ¼” -20

 

 

 

(4) 80860407

 

 

 

 

 

 

 

 

 

 

 

 

79

Image 79 Contents
8140705R9-10/08 Price $5.00 SCGImportant Information Read Carefully Page Table of Contents Dimensions Pre-Installation Do not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerRequired See Section III. Venting / Air Intake PipingBurnham Vent System and Air Intake System Components Vent System Components Included with BoilerVent/Air Intake Length General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Combination Horizontal Vent System Components Install Combination Vent/Air Terminal. See FigureNon-corrosive fasteners must be used Install Air Intake Piping. See Figures 10Combination Horizontal Vent/Air Installation SCG-3 thru Page Combination Vertical Vent System Components Description Part Number SCG-3 & SCG-4General Installation Requirements Pre-Installation ConsiderationsClearances to Combustibles Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page Lwco Location IV. Water Piping and TrimHow to Test How to WireSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Do not manifold vent pipes together VII. Modular InstallationModular Boiler Water Manifold Sizing Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Ignition Module Terminal CROSS-REFERENCE Operating InstructionsYellow led flame codes Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Check limit Adjust gas input rate to boilerGas Flow Rate in Cubic Feet Per Hour Low water cutoff if so equipped IX. ServicePilot Burner Location Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Differential Pressure Switch Settings Procedure for Measuring Differential Pressure See FigureMain Burners and Firebox This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty