Fire Stop/Wall Thimble/Support, (SC_ _FS):

The Saf-T Vent SC Fire Stop can be used as a firestop, a wall thimble, or as a support plate.

To use as a Wall Thimble prepare an opening according to the chart below. Remove any insulation from the opening, using additional framing if necessary. Attach the plate over the center of the opening using appropriate fasteners.

Install the vent section through the thimble plate and secure the section to the thimble by screwing the self-tapping screws through the holes in the tabs on the plate and into the outer wall of the vent. Apply silicone sealant around the vent section where it passes through the plate and around the plate where it is attached to the structure.

To use as a Firestop before passing through ceilings or enclosed chases, prepare a round or square opening ¼” larger than the outer jacket (5¼” for 3” vent or 7¼” for 4” vent). Remove any insulation from the opening. Secure the firestop to the structure at the four (4) corners. Install the vent section through the firestop and secure to the thimble by screwing the self-tapping screws through the holes in the tabs on plate and into outer wall of the vent. This method can also be used to support the vent section either vertically or horizontally.

Tall Cone Flashing:

Directly On Roof or Curb:

Tall Cones are available for flat (SC_ _TCF), 2/12 pitch (SC_ _TCFA), and 6/12 - 12/12 pitch roofs (SC_ _TCFB). Prepare a square or round opening at least 1/4” larger than the outer jacket (5¼” for 3” vent or 7¼” for 4” vent). Remove any insulation from the opening. Apply weather-stripping or outdoor caulk to the bottom of the cone plate and attach the plate to the roof using common construction methods. Flash over the cone plate and seal the fastener heads using normal roofing requirements. When the vent pipe is in place through the Tall Cone, attach a storm collar (sold separately) around the pipe. Apply high temperature silicone sealant around the pipe where it passes through the top of the storm collar. Continue to install vent sections as needed to meet the height requirements by code. Seal weather exposed joints of the outer jacket with foil tape or an exterior grade silicone sealant.

35

Image 35
Contents 8140705R9-10/08 Price $5.00 SCGImportant Information Read Carefully Page Table of Contents Dimensions Pre-Installation Do not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerRequired See Section III. Venting / Air Intake PipingVent/Air Intake Length Vent System Components Included with BoilerBurnham Vent System and Air Intake System Components General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Combination Horizontal Vent System Components Install Combination Vent/Air Terminal. See FigureNon-corrosive fasteners must be used Install Air Intake Piping. See Figures 10Combination Horizontal Vent/Air Installation SCG-3 thru Page Combination Vertical Vent System Components Description Part Number SCG-3 & SCG-4Clearances to Combustibles Pre-Installation ConsiderationsGeneral Installation Requirements Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page Lwco Location IV. Water Piping and TrimHow to Test How to WireSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Modular Boiler Water Manifold Sizing VII. Modular InstallationDo not manifold vent pipes together Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Yellow led flame codes Operating InstructionsIgnition Module Terminal CROSS-REFERENCE Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Gas Flow Rate in Cubic Feet Per Hour Adjust gas input rate to boilerCheck limit Low water cutoff if so equipped IX. ServicePilot Burner Location Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Main Burners and Firebox Procedure for Measuring Differential Pressure See FigureDifferential Pressure Switch Settings This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty