Burnham
1100-H4
manual
Service Record
Install
XI. Repair Parts
How to Wire
Warranty
Dimension
Joint Assembly Instructions
IX. Service
Page 95
SERVICE RECORD
DATE
SERVICE PERFORMED
95
Page 94
Page 96
Image 95
Page 94
Page 96
Contents
8140705R9-10/08 Price $5.00
SCG
Important Information Read Carefully
Page
Table of Contents
Dimensions
Pre-Installation
Do not drop boiler. Do not bump boiler jacket against floor
II. Unpack Boiler
Required See Section
III. Venting / Air Intake Piping
Vent/Air Intake Length
Vent System Components Included with Boiler
Burnham Vent System and Air Intake System Components
General Guidelines
Vent Guidelines Due to Removal of an Existing Boiler
Burnham Gasketed Vent Joint Detail
Install Vent Pipe, Burnham Gasketed Vent System
Vent Piping
Recommended Separate Horizontal Vent/Air Intake Installation
Alternate Separate Horizontal Vent/Air Intake Installation
Page
Page
Separate Vertical Venting System See Figures 6, 7, 8A, 8B
Page
Vertical Vent Installation
Page
Page
Vertical Air Intake Piping
Combination Horizontal Vent System Components
Install Combination Vent/Air Terminal. See Figure
Non-corrosive fasteners must be used
Install Air Intake Piping. See Figures 10
Combination Horizontal Vent/Air Installation SCG-3 thru
Page
Combination Vertical Vent System Components
Description Part Number SCG-3 & SCG-4
Clearances to Combustibles
Pre-Installation Considerations
General Installation Requirements
Page
Joint Assembly Instructions
Inner pipe is always cut 1 longer than the outer pipe
Condensate Drains
Horizontal Supports
Page
Tall Cone Flashing Directly On Roof or Curb
Fire Stop/Wall Thimble/Support, SC FS
Page
Horizontal
Recommended Separate Horizontal Vent Installation
Alternate Separate Horizontal Vent Installation
Optional Indoor Air Vent Terminal Installation
Install vent piping
Optional Separate Horizontal 3 Vent Terminal Installation
Optional Separate Horizontal 4 Vent Terminal Installation
Page
Lwco Location
IV. Water Piping and Trim
How to Test
How to Wire
Supply Water Manifold Piping
Page
Page
Gas Piping
Valves Fully Open
Page
VI. Electrical
Internal Boiler Wiring Schematic Diagram
Internal Boiler Wiring Ladder Diagram
System Controls and Wiring
System Wiring Schematic for Single Zone Space Heating Only
Page
Circulator Zoned System Wiring Schematic
Zone Valve Zoned System Wiring Schematic
Page
Modular Boiler Water Manifold Sizing
VII. Modular Installation
Do not manifold vent pipes together
Modular Boiler Gas Piping
VIII. System Start-up
Operating Instructions
Yellow led flame codes
Operating Instructions
Ignition Module Terminal CROSS-REFERENCE
Green Led status codes
Honeywell Electronic Ignition Troubleshooting Guide
Sequence of Operation
Gas Flow Rate in Cubic Feet Per Hour
Adjust gas input rate to boiler
Check limit
Low water cutoff if so equipped
IX. Service
Pilot Burner Location
Silicone Tubing Assembly
Flue and Burner Cleanout, 1 Burner
Main Burners and Firebox
Procedure for Measuring Differential Pressure See Figure
Differential Pressure Switch Settings
This page Left Intentionally Blank
Page
Page
XI. Repair Parts
Casting Assembly
Page
Base Assembly
Page
Base Enclosure Assembly
Page
FAN/CANOPY Assembly
Page
Burner Assemblies
Page
Control Panel Assembly
Page
Jacket Parts
Miscellaneous Parts Carton
Avoid Breathing Fiber Particulates and Dust
Service Record
Service Record
Limited Warranty
Related pages
All Service page
Service Dial Number for Husqvarna 830
Returning Products for Service for Ikelite 6871.45
Definition des Schweregrads von Serviceanfragen for Cisco Systems SB 107
Mise en service de l’appareil for Pioneer DEH-1400
Contacting Customer Service for Cisco Systems ME 4924-10GE
Service D’ASSISTANCE for Morphy Richards BM48268SMEE
Technical Support and Customer Service for Dell U719F
Garantie et service for Philips HB555
3A. Sprint Service The Basics 131 for LG Electronics Optimus S
Important service repair information for HP t5135
How does dual channel interleaved mode work on the Intel DG33BU?
Dual Channel Mode
Top
Page
Image
Contents