Burnham 1100-H4 manual FAN/CANOPY Assembly

Page 85

Key

Description

 

 

[Quantity] Part Number

 

 

No.

SCG-3

SCG-4

SCG-5

 

SCG-6

SCG-7

SCG-8

SCG-9

 

 

 

 

 

 

 

 

 

 

 

 

4. FAN/CANOPY ASSEMBLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4A

Canopy Assembly - Sea Level

61107031

61107041

61107051

 

61107061

61107071

61107081

61107091

 

 

 

 

 

 

 

 

 

Canopy Assembly - High Altitude

61107032

61107042

61107052

 

61107062

61107072

61107082

61107092

 

 

 

 

 

 

 

 

 

 

 

 

4B

Cerafelt

 

 

 

9206005

 

 

 

 

 

 

 

 

 

 

 

4C

U-Clip

 

 

 

(4) 80861512

 

 

 

 

 

 

 

 

 

4D

Sheet Metal Screw, #10 x 1”

 

 

(4) 808600141

 

 

 

 

 

 

 

 

 

 

 

4E

Fan Gasket

 

 

 

8206085

 

 

 

 

 

 

 

 

 

 

 

 

4F

Fan

 

 

 

81161512

 

 

 

 

 

 

 

 

 

 

 

4G

Lock Washer, #10

 

 

 

(4) 80860636

 

 

 

 

 

 

 

 

 

4H

Machine Screw, #10-24 x 2½”

 

 

(4) 808608982

 

 

 

 

 

 

 

 

 

 

 

 

85

Image 85
Contents 8140705R9-10/08 Price $5.00 SCGImportant Information Read Carefully Page Table of Contents Dimensions Pre-Installation Do not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerRequired See Section III. Venting / Air Intake PipingBurnham Vent System and Air Intake System Components Vent System Components Included with BoilerVent/Air Intake Length General Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Combination Horizontal Vent System Components Install Combination Vent/Air Terminal. See FigureNon-corrosive fasteners must be used Install Air Intake Piping. See Figures 10Combination Horizontal Vent/Air Installation SCG-3 thru Page Combination Vertical Vent System Components Description Part Number SCG-3 & SCG-4General Installation Requirements Pre-Installation ConsiderationsClearances to Combustibles Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Tall Cone Flashing Directly On Roof or Curb Fire Stop/Wall Thimble/Support, SC FSPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page Lwco Location IV. Water Piping and TrimHow to Test How to WireSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Do not manifold vent pipes together VII. Modular InstallationModular Boiler Water Manifold Sizing Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Ignition Module Terminal CROSS-REFERENCE Operating InstructionsYellow led flame codes Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Check limit Adjust gas input rate to boilerGas Flow Rate in Cubic Feet Per Hour Low water cutoff if so equipped IX. ServicePilot Burner Location Silicone Tubing AssemblyFlue and Burner Cleanout, 1 Burner Differential Pressure Switch Settings Procedure for Measuring Differential Pressure See FigureMain Burners and Firebox This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty