Page 70

O.Check limit.

1.Adjust thermostat to highest setting.

2.Observe temperature gauge. When temperature is indicated, adjust limit to setting below observed temperature. Main burners and pilot burner should extinguish, and blower should stop.

3.Adjust limit to setting above observed temperature. Ignition sequence should begin.

4.Adjust thermostat to lowest setting. Adjust limit to desired setting.

P.Adjust gas input rate to boiler.

1.Adjust thermostat to highest setting.

2.Check manifold gas pressure. See Table 5 or rating label located in the boiler’s vestibule compartment. Adjust gas valve pressure regulator as necessary (turn adjustment screw counterclockwise to decrease manifold pressure, or clockwise to increase manifold pressure). If pressure cannot be attained, check gas valve inlet pressure. If less than minimum indicated in Table 5 or boiler’s rating label, contact gas supplier for assistance.

3.Clock gas meter for at least 30 seconds. Use Table

13 to determine gas flow rate in Cubic Feet per

Hour.

WARNING

Failure to properly adjust gas input rate will result in over firing or under firing of the appliance. Improper and unsafe boiler operation may result.

4.Determine Input Rate. Multiply gas flow rate by gas heating value.

5.Compare measured input rate to input rate stated on rating plate.

a.Boiler must not be over fired. Reduce input rate by decreasing manifold pressure. Do not reduce more than 0.3 inch w.c. If boiler is still overfired, contact your Burnham distributor or Regional

Office for replacement Gas Orifice.

b.Increase input rate if less than 98% of rating plate input. Increase manifold gas pressure no

more than 0.3 inch w.c. If measured input rate is still less than 98% of rated input:

i.Remove Main Burners per procedure in Section IX: Service.

ii.Remove gas orifices. Drill one (1) drill size larger (drill size is stamped on orifice, or see

Section X: Repair Parts).

iii.Reinstall gas orifices and main burners.

Measure input rate.

6.Recheck Main Burner Flame.

7.Return other gas-fired appliances to previous conditions of use.

Q.Review User’s Information Manual and system operation with owner or operator.

Table 13: Gas Flow Rate in Cubic Feet Per Hour

Seconds

Size of Gas Meter Dial

for One

One-Half

One

Two

Revolution

Cu. Ft.

Cu. Ft.

Cu. Ft.

30

60

120

240

32

56

113

225

34

53

106

212

36

50

100

200

38

47

95

189

40

45

90

180

42

43

86

172

44

41

82

164

46

39

78

157

48

37

75

150

50

36

72

144

52

35

69

138

54

33

67

133

56

32

64

129

58

31

62

124

60

30

60

120

70

Image 70
Contents SCG 8140705R9-10/08 Price $5.00Important Information Read Carefully Page Table of Contents Dimensions Pre-Installation II. Unpack Boiler Do not drop boiler. Do not bump boiler jacket against floorIII. Venting / Air Intake Piping Required See SectionBurnham Vent System and Air Intake System Components Vent System Components Included with BoilerVent/Air Intake Length Vent Guidelines Due to Removal of an Existing Boiler General GuidelinesInstall Vent Pipe, Burnham Gasketed Vent System Burnham Gasketed Vent Joint DetailVent Piping Recommended Separate Horizontal Vent/Air Intake Installation Alternate Separate Horizontal Vent/Air Intake Installation Page Page Separate Vertical Venting System See Figures 6, 7, 8A, 8B Page Vertical Vent Installation Page Page Vertical Air Intake Piping Install Combination Vent/Air Terminal. See Figure Combination Horizontal Vent System ComponentsInstall Air Intake Piping. See Figures 10 Non-corrosive fasteners must be usedCombination Horizontal Vent/Air Installation SCG-3 thru Page Description Part Number SCG-3 & SCG-4 Combination Vertical Vent System ComponentsGeneral Installation Requirements Pre-Installation ConsiderationsClearances to Combustibles Page Joint Assembly Instructions Inner pipe is always cut 1 longer than the outer pipe Condensate Drains Horizontal Supports Page Fire Stop/Wall Thimble/Support, SC FS Tall Cone Flashing Directly On Roof or CurbPage Horizontal Recommended Separate Horizontal Vent Installation Alternate Separate Horizontal Vent Installation Optional Indoor Air Vent Terminal Installation Install vent piping Optional Separate Horizontal 3 Vent Terminal Installation Optional Separate Horizontal 4 Vent Terminal Installation Page IV. Water Piping and Trim Lwco LocationHow to Wire How to TestSupply Water Manifold Piping Page Page Gas Piping Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring System Wiring Schematic for Single Zone Space Heating Only Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Do not manifold vent pipes together VII. Modular InstallationModular Boiler Water Manifold Sizing Modular Boiler Gas Piping VIII. System Start-up Operating Instructions Ignition Module Terminal CROSS-REFERENCE Operating InstructionsYellow led flame codes Green Led status codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Check limit Adjust gas input rate to boilerGas Flow Rate in Cubic Feet Per Hour IX. Service Low water cutoff if so equippedSilicone Tubing Assembly Pilot Burner LocationFlue and Burner Cleanout, 1 Burner Differential Pressure Switch Settings Procedure for Measuring Differential Pressure See FigureMain Burners and Firebox This page Left Intentionally Blank Page Page XI. Repair Parts Casting Assembly Page Base Assembly Page Base Enclosure Assembly Page FAN/CANOPY Assembly Page Burner Assemblies Page Control Panel Assembly Page Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Service Record Service Record Limited Warranty