DCS 36/48BGB manual Installer Checklist

Page 21

INSTALLATION

INSTALLER CHECKLIST

Specified clearances main-

Each burner lights satis-

Unit tested and free of

tained to combustibles.

factorily, individually or

leaks.

Verified proper enclosure

with adjacent burner lit.

User informed of gas

 

ventilation.

Air shutters adjusted.

supply shut-off valve

All internal packaging and

Low flame setting satis-

location.

 

any adhesive residue

factory.

All radiants are assembled

removed. To remove stub-

Drip pan in place properly

and put in place.

born residue, use rubbing

 

and sliding freely.

Check match lighting.

alcohol or a commercially

Pressure regulator con-

PLEASE LEAVE THESE

available adhesive remov-

er.

nected and set for 4.0”

INSTRUCTIONS WITH THE

Removed shipping brack-

W.C. Natural, 11.0” W.C. LP

USER.

gas.

USER, PLEASE RETAIN

ets

 

Knobs turn freely, bezels

Manual shut-off valve

THESE INSTRUCTIONS

installed and accessible.

FOR FUTURE REFERENCE.

centered.

 

 

 

 

 

NOTE:

If any of the listed items are missing, contact DCS at (888) 936-7872. Please be prepared with your Model #, Serial # and description of item(s) that are missing.

Tag location of

Model # and Serial #

Read all installation instructions in this manual to see if the unit has been properly installed. If not done or done correctly, correct before using the unit.

19

Image 21
Contents User guide Page Please Retain this Manual for Future Reference Message to OUR CustomersTable of Contents Important Safety Notice Safety Practices & PrecautionsAIR Flow Grill PlacementSafety Practices & Precautions Grill Models Installation Locating GRILL/BUILT-IN ClearancesLocation Clearances to Non-Combustible Construction Clearances to Non-Combustible ConstructionClearances to Combustible Construction GeneralInsulated Jacket BUILT-IN Construction Details Access Drawers Cutout dimensions GAS HOOK-UP LP Gas LP Tank RequirementsCenter of manifold cut out projected to floor of the island LP Tank Restraint for BUILT-IN InstallationStep Leak Testing Before TestingTo Test Grill Burner AIR Adjustment Burner AdjustmentLOW Flame Setting Adjustment Grill Burner Flame HeightRadiant Asssembly Installation Radiant AssemblyInstaller Checklist Lighting Instructions Using the GrillTo Light the Grill Burner To Light Dual Side Burners 48BQR Models onlyGrill GrillingDIRECT/INDIRECT Cooking Notes Burner OffGrilling Hints DUAL-SIDED GratesShaped Grate Radius Grate Using the Smoker System To Light the Smoker BurnerWood Chips Using the Rotisserie Recommended PreparationWorking Area Meat PreparationManual Lighting To Light the Rotisserie Burner Before CookingCooking on Rotisserie Care and Maintenance Grill Burner Cleaning To Remove the U-BURNERS for CleaningOrifice Cleaning Stainless SteelSmoker Burner Side Burners BGB48 BQR ModelBefore Calling for Service TroubleshootingGrill WON’T Light When the Ignition Button is Pushed LOW Heat with Knob in HI/SEAR PositionHOW to Obtain Service ServiceLimited Warranty WarrantyHOW Long does the Limited Warranty LAST? This Warranty does not CoverHOW to GET Service Commercial USENo Other Warranties Page Page Veuillez Conserver CE Manuel À Titre DE Référence ’INTENTION DE NOS ClientsTable DES Matières Autocollant Mesures DE Sécurité ET DE PrécautionDe ventilation Flux Dair Préféré Emplacement DU GrilRemarque Modèles DE Gril Emplacement Emplacement DU Gril ET DES DégagementsEspaces de dégagement pour une construction non combustible Enveloppe Isolée GénéralitésDisposition standard pour une enceinte non combustible Détails D’UNE Construction IntégréeModèle Exigences Concernant LE GAZ Branchement DU GAZBranchement DU GAZ Naturel Pour Connecter LES Raccords Fournis Avec LE GrilExigences Concernant LA Bouteille DE Propane Mise EN GardeRemarque Placez le dispositif de retenue de bouteille dans l’îlot Fig Test DE Détection DES Fuites Avant la vérificationPour tester Réglage D’AIR DU Brûleur DU Gril Réglages DES BrûleursHauteur DES Flammes DU Brûleur DU Gril Réglages Pour Niveau BASInstallation DE L’ENSEMBLE DU Radiant Installation DE L’ENSEMBLE DU RadiantListe DE Contrôle DE L’INSTALLATEUR Instructions D’ALLUMAGE Utilisation DU GrilPour Allumer LE Brûleur DU Gril Allumage du gril à l’allumetteAllumage des brûleurs latéraux avec une allumette Instructions D’ALLUMAGE/CUISSON SUR GrilBrûleurs latéraux GrilConseils AU Sujet DU Gril Cuisson SUR GrilGrille EN Forme DE « W » Grille Arondie Grilles Double FaceUtilisation DU Système À Fumoir Pour Allumer LE Brûleur À FumoirCopeaux DE Bois Utilisation DE LA Rôtissoire Préparation RecommandéAllumage Manuel Pour Allumer LE Brûleur DE Rôtisserie Avant DE Faire CuireCuisson SUR LA Rôtissoire Entretien ET Nettoyage Électrodes Acier InoxydableBrûleur DU Gril Déposer DES Brûleurs EN U Pour LE NettoyageBrûleurs Latéraux BGB48 BQR ModeleBrûleur À Fumoir Dépannage Avant D’APPELER LE Service TechniqueChaleur Faible Avec LE Bouton EN Position « SEAR/HI » LA Rôtissoire NE S’ALLUME PASPour L’OBTENTION DU Service DE Garantie Garantie Limitée GarantieFisher & Paykel S’ENGAGE À Quelle EST LA Durée DE LA Garantie LIMITÉE?Pour Obtenir DES Réparations Utilisation CommercialeAucune Autre Garantie Remarque US CA