Blodgett XR8-G manual Oven Assembly, Assembly to Stand, Assembly to Optional Proofer

Page 8

Installation

Oven Assembly

ASSEMBLY TO STAND

1.Center the oven frame on top of the stand so that the oven overhangs at both the front and back. See Figure 1.

2.Remove the three screws at the top of the left and right side panels of the oven. Remove the side panels.

3.Align the two bolt holes on each side of the stand with the two threaded holes on each side of the oven. See Figure 1.

4.Insert a bolt from the bottom up through each of the two holes and tighten securely.

5.Reinstall the side panels.

ASSEMBLY TO OPTIONAL PROOFER

1.Center the oven frame on top of the proofer so that the oven overhangs at both the front and back. See Figure 1.

2.Remove the four screws on the back of the proofer. Remove the left and right side panels.

3.Align the two bolt holes on each side of the proofer with the two threaded holes on each side of the oven. See Figure 1.

4.Insert a bolt from the bottom up through each of the two holes and tighten securely.

5.Reinstall the side panels.

SIDE VIEW WITH STAND

SIDE VIEW WITH OPTIONAL PROOFER

Figure 1

4

Image 8
Contents XR8-G Avertissement Reputation YOU can Count on Page Table of Contents/Table des Matières Oven Description and Specifications GAS Specifications -- XR8-G/AAPlumbing Specifications -- XR8-G/AA IntroductionInstallation Delivery and LocationDelivery and Inspection Oven LocationAssembly to Optional Proofer Oven AssemblyAssembly to Stand Canadian installations General export installationsVentilation Canopy Type Exhaust HoodUtility Connections --- Standards and Codes Gas Connection GAS PipingPressure Regulation and Testing Inlet Pressure Natural PropaneKPa Manifold Pressure Natural Propane KPaGAS Hose Restraint Electrical Specifications Plumbing and Electrical ConnectionsPlumbing Connections Electrical ConnectionsAdjustments Associated with Initial Installation Initial StartupSafety Information Safety TipsWhat to do in the event of a power failure General safety tipsSolid State Digital Control Control DescriptionStandard Control OperationGeneral Guidelines for Operating Personnel Operating TipsMaintenance Cleaning and Preventative MaintenanceCleaning the Oven Preventative MaintenanceTroubleshooting Guide Possible Causes Suggested RemedySpecifications Pour GAZ -- XR8-G/AA Description et Spécifications du FourGaz Naturel Gaz Propane Unités US Unités SI Spécifications DE Plomberie -- XR8-G/AAImplantation DU Four Livraison et ImplantationLivraison ET Inspection Assemblage SUR UNE Étuve DE FER- Mentation Optionnelle Montage du FourAssemblage SUR UN Stand Installation aux États-Unis et au Canada Généralités concernant les installations à l’ex- portationAvertissement Hotte D’ÉVACUATION Type VoûteBranchements de Service --- Normes et Codes Généralités concernant les installations à l’exportationLongeur Dimensions nominales De conduit Pieds Branchement de GazConduit DE GAZ ExempleKPa Pression au collecteur Gaz Naturel Gaz Propane Réglage ET Test DE PressionPression à l’entrée Gaz Naturel Gaz Propane Retenue DU Tuyau DE GAZ Raccordement Électrique et Plomberie Raccordement Plomberie AvertissementRaccordements de purge Raccordement ÉlectriqueRéglages À Faire Lors DE L’INSTALLA- Tion Initiale Mise en Marche InitialeUtilisation Informations de SécuritéConseils DE Sécurité Que faire en cas de panne de secteurCommande Classique Description DES CommandesUtilisation Consignes Générales à l’Intention des Utilasateurs ConseilsMaintenance Preventive Maintenance annuelleEntretien Nettoyage et Entretien PréventifGuide de Détection des Pannes Causes Probables SuggestionGuide de Détection des Pannes Insert Wiring Diagram Here Placer Schéma DE Câblage ICI