Allied Telesis AT-PWR06, AT-DC2552XS, AT-FAN06 manual Installing Power Supply Blank Cover

Models: AT-FAN06 AT-DC2552XS AT-PWR06

1 84
Download 84 pages 30.01 Kb
Page 51
Image 51
Installing Power

Installing Power

Supply Blank

Cover

Stack Installation Guide for AT-2552XS L2 Data Center Switch

Note

If a new AT-PWR06 power supply module is not available to replace the module you are removing, perform the procedure outlined in “Installing Power Supply Blank Cover” on page 51.

4.Slowly insert the new AT-PWR06 power supply module into the PSU slot until it is flush with the front of the chassis.

5.Tighten the captive screws to fasten of the power supply module to the chassis.

6.Turn the power on to the newly installed AT-PWR06 power supply module by connecting the AC power cord.

If you have removed an AT-PWR06 power supply module from the chassis and a replacement power supply module is not available, the blank power supply cover should be installed to insure proper airflow in the chassis.

Caution

The PSU blank cover should be installed if an AT-PWR06 power supply module is not installed in the power supply slot. This blank cover assures that the correct airflow across the components within the chassis when a power supply module is not installed.

Perform the following procedure to install the blank power supply cover:

1.Locate the blank power supply cover that was originally shipped with the chassis.

2.Remove the AT-PWR06 power supply module by following steps 1 - 3 in “Replacing Power Supply Module” on page 50.

3.Once the AT-PWR06 power supply module has been removed, place the blank power supply cover over the vacant power supply slot.

4.Tighten the captive screws on the power supply blank cover.