Chapter 4: Installing the SFP+ and QSFP+ Transceivers and Cables

Figure 26. Installing a SFP+ Transceiver

Note

If you are ready to attach the fiber optic cable to the transceiver, continue with the next step. Otherwise, repeat steps 1 to 5 to install the remaining SFP+ transceivers in the chassis. Do not remove the dust cover from the installed SFP+ transceiver(s) until you are ready to install the fiber optic cable.

6. Remove the dust cover from the module. See Figure 27.

Figure 27. Removing SFP+ Dust Cover