AMCC 9590SE-4ME manual cx show rebuild

Models: 9590SE-4ME

1 93
Download 93 pages 38.98 Kb
Page 47
Image 47
/cx show rebuild

Controller Object Commands

In order to redirect the output you must run the following command from a command line, not from within the tw_cli shell.

tw_cli /c0 show diag > diag.txt

/cx show rebuild

9000 series controllers support background tasks and allow you to schedule a regular time when they occur.

Rebuild is one of the supported background tasks. Migrate and initialize are other background tasks that follow the same schedule as rebuild. Other background tasks for which there are separate schedules are verify and selftest. For each background task, up to 7 time periods can be registered, known as slots 1 through 7. Each task schedule can be managed by a set of commands including add, del, show and set a task. Background task schedules have a slot id, start-day-time, duration, and status attributes.

For details about setting up a schedule for background rebuild tasks, see “Setting Up a Rebuild Schedule” on page 45.

Rebuild activity attempts to (re)synchronize all members of redundant units such as RAID-1, RAID-10, RAID-5 and RAID-50. Rebuild can be started manually or automatically if a spare has been defined. Scheduled rebuilds will take place during the scheduled time slot, if enabled the schedules are enabled. For in depth information about rebuild and other background tasks, see “About Background Tasks” in the 3ware Serial ATA RAID Controller User Guide.

The show rebuild command displays the current rebuild background task schedule as illustrated below.

//localhost> /c1 show rebuild Rebuild Schedule for Controller /c1

========================================================

Slot Day HourDuration Status

--------------------------------------------------------

1

Mon

2:00pm

10

hr(s)

disabled

2

Thu

7:00pm

18

hr(s)

disabled

3

-

-

-

 

disabled

4

-

-

-

 

disabled

5

-

-

-

hr(s)

disabled

6

Mon

1:00am

4

disabled

7

Sun

12:00am

1

hr(s)

disabled

A status of “disabled” indicates that the task schedule is disabled. In this case, the controller will not use the defined schedule timeslots. If the rebuild command is entered manually, rebuilding will start within 10 to 15 minutes. It will begin automatically if a rebuild is needed and a proper spare drive is set up.

www.3ware.com

41

Page 47
Image 47
AMCC 9590SE-4ME manual cx show rebuild