Rack Assembly

Assembling the bottom section

The bottom section of the rack will contain shelves #3 and #4.

1.Bolt Cross Bar #1 to Bottom Side Subassembly #1 at hole position #2 (from front) on the LOWER horizontal support of the Subassembly. Use (1) 3/8-16 x 1” bolt and related hardware:

(2) 3/8 washers and (1) 3/8 KEPS nut.

3/8-16 x 1” Bolt

Bottom Side Subassembly #1

(870-1658A)

(812-0723)

 

3/8 Washers (812-2030)

3/8 KEPS Nut

Hole Position #2(812-3101)from Front

Cross Bar #1 (870-3698)

2.Bolt Cross Bar #2 to Bottom Side Subassembly #1 at hole position #6 (from front) on the LOWER horizontal support of the Subassembly. Use (1) 3/8-16 x 1” bolt and related hardware:

(2) 3/8 washers and (1) 3/8 KEPS nut.

Bottom Side Subassembly #1

Hole Position #6

from Front

Cross Bar #2

(870-3698)

Cross Bar #1