Rack Assembly

2.Using specified cable, connect the open BAT 1- terminal in Terminal Block #1 to the open negative (-) terminal on Battery #32. Before making connections, apply ONE cable boot. If lug sizes are different, apply boot to the cable end with the SMALLER lug.

At Terminal Block #1: Connect the lug on the cable end WITHOUT the boot to the open BAT 1- terminal. Secure lug to stud with preset washer and nut. Snake cable end WITH the boot between centrally located rails until it reaches Battery #32.

At Battery #32: Connect the lug on the cable end WITH the boot to the open negative (-) terminal on Battery #32. Snap the boot over the connected lug/terminal. Use zip ties as needed to relieve cable strain.

28

27

26

shelf-to-shelf

 

 

 

 

from Battery #24

 

 

 

25

 

 

 

 

 

 

 

 

 

 

 

 

Terminal Block #1

 

32

 

31

 

30

 

29

Rack #1, Bottom Shelf

+

-

30

Battery Rack Assembly and Installation Manual

Page 36
Image 36
American Power Conversion 400kW1MW installation manual Shelf-to-shelf From Battery #24