Rack Assembly

4.Using specified cable, connect the open BAT 2- terminal in Terminal Block #2 to the open negative (-) terminal on Battery #64. Before making connections, apply ONE cable boot. If lug sizes are different, apply boot to the cable end with the SMALLER lug.

At Terminal Block #2: Connect the lug on the cable end WITHOUT the boot to the open BAT 2- terminal. Secure lug to stud with preset washer and nut. Snake cable end WITH the boot between centrally located rails until it reaches Battery #64.

At Battery #64: Connect the lug on the cable end WITH the boot to the open negative (-) terminal on Battery #64. Snap the boot over the connected lug/terminal. Use zip ties as needed to relieve cable strain.

60

59

58

shelf-to-shelf

57

from Battery #56

Terminal Block #2

 

64

 

63

 

62

 

61

Rack #2, Bottom Shelf

+

-

32

Battery Rack Assembly and Installation Manual

Page 38
Image 38
American Power Conversion 400kW1MW installation manual Shelf-to-shelf From Battery #56