Rack Assembly
Battery Rack Assembly and Installation Manual 29
1. Using specified cable, connect the open BAT 1+ terminal in Terminal Block #1 to the open
positive (+) terminal on Battery #1. Before making connections, apply ONE cable boot. If lug
sizes are different, apply boot to the cable end with the SMALLER lug.
At Terminal Block #1: Connect the lug on the cable end WITHOUT the boot to the open BAT
1+ terminal. Secure lug to stud with preset washer and nut. Snake cable end WITH the boot
between centrally located rails until it reaches Battery #1.
At Battery #1: Connect the lug on the cable end WITH the boot to the open positive (+) terminal
on Battery #1. Snap the boot over the connected lug/terminal. Use zip ties as needed to relieve
cable strain.
Rack #1, Top Shelf
Terminal Block #1
to Battery #9
1
2
37
6
5
8
4shelf-to-shelf
+-