Rack Assembly

1.Using specified cable, connect the open BAT 1+ terminal in Terminal Block #1 to the open positive (+) terminal on Battery #1. Before making connections, apply ONE cable boot. If lug sizes are different, apply boot to the cable end with the SMALLER lug.

At Terminal Block #1: Connect the lug on the cable end WITHOUT the boot to the open BAT 1+ terminal. Secure lug to stud with preset washer and nut. Snake cable end WITH the boot between centrally located rails until it reaches Battery #1.

At Battery #1: Connect the lug on the cable end WITH the boot to the open positive (+) terminal on Battery #1. Snap the boot over the connected lug/terminal. Use zip ties as needed to relieve cable strain.