Rack Assembly

10.Bolt Cross Bar #8 to Top Side Subassembly #2 at its opposite hole position #6 (from front). Use

(1) 3/8-16 x 1” bolt and related hardware: (2) 3/8 washers and (1) 3/8 KEPS nut.

 

STEP 9 Connection

 

Cross Bar #8

Top Side Subassembly #1

(870-3698)

STEP 10 Connection

STEP 7 Connection

Cross Bar #7

Top Side Subassembly #1

(870-3698)

 

STEP 8 Connection

14

Battery Rack Assembly and Installation Manual

Page 20
Image 20
American Power Conversion 400kW1MW installation manual Connection