Appendix C: Employing Sidecars

4.Using one (1) 120 mm2 [#4/0] cable, connect the BAT 2- terminal in Terminal Block #2 to either of the two BAT 2- vertical bars in the Sidecar.

At Terminal Block #2: If using top cable entry, connect to top terminal (as shown) of the BAT 2- segment on right. Otherwise, connect to bottom terminal. Secure lug to stud with preset washer and nut. To relieve strain, zip tie cable to the shelf directly above the terminal block.

To BAT 2-

+-

Terminal Block #2

At the Sidecar: Connect other cable end to one of the single-hole landings atop either of the BAT 2- vertical bars. Secure lug to landing with M10 [3/8”] bolt, washer, lock washer, and hex nut (hardware is not supplied).

To BAT 2-

5.To connect additional racks to this same sidecar, repeat steps 1-4, while using different landing holes on the sidecar’s vertical bars.

Battery Rack Assembly and Installation Manual

49

Page 55
Image 55
American Power Conversion 400kW1MW installation manual Appendix C Employing Sidecars