Rack Assembly

5.Remove protective boot and connect this same cable end to the open positive (+) terminal on the first battery in the lower shelf. Snap cable boot over connected lug/terminal.

Shelf-to-shelf Wiring

4

8

12

16

3

7

11

15

2

6

10

14

1

5

9

13

Top Shelf

2nd Shelf

Assembling the second rack

The battery racks must be deployed in multiples of two.

Repeat all previous steps to assemble, load, and wire the second battery rack.

The first rack (Rack #1) contains the BAT 1 string (batteries #1-32), and the second rack (Rack #2) contains the BAT 2 string (batteries #33-64).