Chapter Three
Unpacking and Installing Frame
Because the installation process begins on the loading dock, this chapter provides the procedures for inspecting the SymmetraTM Power Array frame and modular components when they arrive. It includes procedures for moving the frame to the installation site, removing it from the pallet, and preparing the frame and the modules for installation.