Manuals
/
American Power Conversion
/
Computer Equipment
/
Power Supply
American Power Conversion
SYMSTRF-PD, SYMINIF-PD
user manual
Electrical Requirements and Procedures
Models:
SYMSTRF
SYMINIF
SYMSTRF-PD
SYMINIF-PD
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
75
Download
75 pages
19.36 Kb
31
32
33
34
35
36
37
38
39
40
Specification
Install
Alarm Threshold Status Screen
Fault
Symbols Used In This Manual
SymmetraTM Wiring
Warranty
Maintenance
Output Wiring Configurations
Diagnostics
Page 36
Image 36
Chapter 4 - Electrical Requirements and Procedures
4-10
Page 35
Page 37
Page 36
Image 36
Page 35
Page 37
Contents
Syminif SYMINIF-PD Symstrf SYMSTRF-PD
Radio Frequency Interference
990-7770A Revised 10/97
Limited Warranty
Life Support Policy
Table of Contents
Index
Introduction
Fig I-2Functional Diagram of a SymmetraTM
Thank You SymmetraTM Overview
Theory of Operation
Fig I-1MiniFrame and MasterFrame
Power Processing System
Battery Source
Control/User Interface
Transformer
Load-Disconnect Mode
On-Line Operating Mode
Fig I-3Load-Disconnect Operating Mode
Fig I-4On-Line Operating Mode
On-Battery Operating Mode
Bypass Operating Mode
Fig I-5On-Battery Operating Mode
Fig I-6Bypass Operating Mode
Definitions
Important Information
Safety Information
Symbols Used In This Manual
Important Safety Instructions
Tech
Physical Representation
Power Array Frame
2An Empty MasterFrame grill covers removed
1A Fully Loaded MiniFrame grill covers removed
Powerview User Interface
Power Module
Battery Module
Louvered Grill Covers
Maintenance Bypass Switch
Main Intelligence Module MIM
Redundant Intelligence Module RIM
Input Circuit Breaker
Rear View of a Power Array
Site Preparation
Space and Weight Considerations
Transporting Power Array to Installation Site
Operating Conditions
BTU Output
Site Preparation
Unpacking and Installing Frame
Tools Required for Setup
Storage of Battery and Power Modules
Initial Inspection
Check For Damage
Moving Battery & Power Modules
Clean-UP
Remove Packing Materials
Remove the Frame from the Pallet
Wiring Requirements & Procedures
SymmetraTM Wiring
Input Wiring
Output Wiring
Repo Switch Wiring
Input Wiring
Input Wiring Specifications
Voltage Jumper Procedure
Input Wiring Procedure
3Removal of Input Hardwiring Panels
4Input Wiring Pathway
5Input Hardwiring Configuration
Output Wiring
Output Wiring Configurations
Output Overcurrent Protection
8Output Wiring Configuration for 120V/240V Output Voltages
Output Wiring Installation
Output Wiring Procedure
Power Distribution Units Optional
Grounding Electrode Optional
Remote Emergency Power Off Switch
Repo Specifications
Repo Switch Installation
Cable Specifications
Electrical Wiring Test
Electrical Wiring Test/Checklist
Contact Closure Repo Switch Connection
Vdc Repo Switch Connection
16Startup Screen
4Input/Output Measured Voltage Multipliers
Electrical Requirements and Procedures
Setting Up The Power Array
Setup of Power Array
Frame Leveling Procedure
Removing Cover Grills
1Removing Cover Grills from Frame
Installing the Battery Modules
Procedure for Battery Module Installation
2Location of Battery Module Bays
3Battery Alignment Grooves and Runners
Installing the Power Modules
Procedure for Power Module Installation
Installing the Main Intelligence Module MIM
Installing the Redundant Intelligence Module RIM
Procedure for Main Intelligence Module MIM Installation
9Location of the MIM and RIM
Installing the PowerView Interface
Remote Placement of the PowerView
Wall Mounting the PowerView
SmartSlotTM Interface Accessories
13PowerView Wall Mounting Template
Installation Test
Installation Test/Checklist
19Power Status Screen
1SymmetraTM Power Module/Frame Capacities
21Power The Load Sequence
20Miscellaneous Status Screen
25Power Down the Load Sequence
23Initiate a Self-Test Sequence
24Return to On-Line Sequence
System Setup
PowerView Display
PowerView Display
Physical Features of the Powerview
PowerView Functions
1The PowerView Interface
PowerView LEDs
1Power Array Display LEDs
Color Description
Navigation Keys
Startup Screen
Top-Level Menu Screen
Control
Status
Setup
Accessories
Diagnostics
Logging
Configuring & Operating the SymmetraTM
Powering the Power Array
Introduction
1Startup Screen
Powering the Loads
Review Status Conditions
Voltage Status Screen
Battery Status Screen
Power Status Screen
Load With Redundancy Status Screen
Alarm Threshold Status Screen
Perform a Self Test
Miscellaneous Status Screen
Configure Shutdown Parameters
Configure Alarms
Alarm Thresholds Selection Screen
Switching Audible Alarm Beeper Off
Review Diagnostic Information
Diagnostics Menu Screen
Review Logging Menu
Event Log Screen
Module Replacement
Module Replacement
Module Failure Alarm Indicators
Technical Support and Obtaining a Replacement Module
Returning Modules to APC
Battery Module Replacement
Removing a Battery Module
Installing the Replacement Module
Replacement Battery Module Verification
Power Module Replacement
Removing the Power Module
Replacement Module Verification
Installing the Replacement Main Intelligence Module
Installing the Replacement Redundant Intelligence Module
Replacement Redundant Intelligene Module Verification
Replacement MIM Verification
PowerView Display Messages
PowerView Message Meaning Corrective Action Start-Up
PowerView Message Meaning Corrective Action General Status
Min Runtime restored
PowerView Meaning Corrective Action Message Module
Alarm
Failure
Threshol
PowerView Meaning Corrective Action Message Bypass
Fault
PowerView Message Meaning Corrective Action General Fault
PowerView Display Messages
Index
Index
SmartSlot accessories
Toll free technical support
Top
Page
Image
Contents