Maintenance
Obtaining a License for Replacement Units
When replacing the ETEP with a spare, the replacement ETEP will run at full throughput for a grace period. During the grace period, contact customer support to report the RMA unit and to receive a new license for the replacement. Licenses are linked to the serial number of the ETEP on which they are installed. You cannot install a license intended for one ETEP on a different ETEP.
Upon receipt of the new license, install it on the ETEP as described in “Entering a Throughput License” on page 80.
Replacing a Power Supply
The ET1000A and ET10000A come with dual internal power supplies. In the event of a failure, the power supplies can be removed and replaced in the field.
Replacing the ET1000A Power Supply
CAUTION
Disconnect all power cords before servicing the ET1000A.
To replace a power supply in the ET1000A:
1Unplug both power supplies at the power source.
2On the rear panel, lift the power cord clip on the affected power supply, and then remove the power cord from the receptacle (Figure 43).
Figure 43 Power cord is removed from power supply # 2
3Locate the release lever on the left of the power supply (Figure 44). Press the release lever inward toward the metal support to release the power supply latch. Pull the power supply outward to remove it from the chassis.
66 | ETEP Installation Guide |