Bosch Appliances UPH-Z Reference # Description, Base Gasket Screw Ring Washer Bracket Support

Models: UPH-Z UPH-2D UPH-3D

1 64
Download 64 pages 19.24 Kb
Page 13
Image 13

High Speed Pan/Tilt System

Installing the High Speed Pan/Tilt en 13

 

 

8.Fasten the base to the wall or pole mount with the supplied screws and washers (use a calibrated torque wrench setting of 2.1 Nm).

 

 

 

1

 

1

6

 

 

2

7

2

 

 

 

 

3

 

3

 

 

 

4

 

4

 

 

 

 

 

5

 

5

 

 

 

Fig. 4.3 Wiring the Device

 

 

Reference #

Description

 

 

1

Base

 

 

2

Gasket

 

 

3

Screw Ring

 

 

4

Washer

 

 

5

Screw

 

 

6

Bracket

 

 

7

Support

 

 

Fig. 4.4 Preparing the Cables for Wiring

9.Cut the cables to approximately 152.4 mm (6 in) (see Figure 4.4). The earth cable must be longer then the power wires approximately 10 mm or more to prevent the stretch dis- connecting.

10.Cover the cable with a plastic tube and fix it with the tie thread.

Bosch Security Systems

Instruction Manual

F01U.073.990 Version 1.0 2007.07

Page 13
Image 13
Bosch Appliances UPH-Z, UPH-2D, UPH-3D Reference # Description, Base Gasket Screw Ring Washer Bracket Support