INSTALLATION

a.Check that the device at the other end of the link has power.

b.Verify that the fiber strands are properly “crossed-over” between the ports on the module and on the fiber optic device at the other end of the fiber optic link segment.

c.Verify that the fiber connection meets the dB loss limit specifications outlined in Chapter 2.

d.Check that the port is enabled through MicroMMAC-T Local Management.

e.If a link still can not be established, contact Cabletron Systems Technical Support.

3.10 CHECKING THE INSTALLATION

To check MicroMMAC-T installation:

1.Trace the ring path through the network to be sure that there are no breaks in the ring and that it is free from logical design errors.

a.Check that each cable connection is secure and logically correct.

b.Verify the pinouts for each connection.

c.Use a cable tester to check the cable conductors for continuity.

2.Check that all devices operating on the same network are set to the same ring speed.

3.Ensure that the maximum number of stations is not exceeded.

4.Ensure that the maximum cable length to each station is not exceeded.

5.Ensure that the networking software is configured properly to match the installed network.

When these checks are successfully cleared, the MicroMMAC-T is ready for normal operation. If errors or other problems are encountered, see Chapter 5, Troubleshooting, for information about diagnosing operational problems.

If problems still occur, contact your Cabletron Technical Support representative.

3-19

Page 54
Image 54
Cabletron Systems MICROMMAC-22T, 42T manual Checking the Installation, To check MicroMMAC-T installation