Ciprico 4105 Series user manual Unit Power-Up Sequence, LED Power-On Sequence

Models: 4105 Series

1 131
Download 131 pages 9.38 Kb
Page 42
Image 42
Unit Power-Up Sequence

MediaVault 4105 User Manual

Operations

Unit Power-Up Sequence

1.Always power-up the MV 4105 before powering-up the host computer.

IMPORTANT: Wait for the MV 4105 to completely boot-up before powering-up the host computer.

2.If the MV 4105 needs to be re-booted:

Shut down the host computer.

Power-cycle the MV 4105.

Re-boot the host computer.

The unit power-up sequence allows the disk drive modules, and the data access/data transmission functions of the MV 4105, to be fully operational before the host computer is booted-up and “sees” the MV 4105 activities.

LED Power-On Sequence

The front panel LEDs of the MV 4105 power-up in the following sequence. Depending on the size and type of the drive, some LEDs might blink on momentarily, go off, then illuminate fully after a minute or so.

TABLE 5-4.LED Power-Up Sequence.

1.Power LED.

2.RAID 3 LED (momentarily, if unit is in RAID 3 when powered-up).

3.D1 through D5 LEDs (blink momentarily before illuminating fully, depending on the size and type of drive).

4.4 Gb LED (illuminates after host computer is powered-up).

MV 4105_Ciprico Inc.

5-7

Page 42
Image 42
Ciprico 4105 Series user manual Unit Power-Up Sequence, LED Power-On Sequence