C H A P T E R 2

Preparing for Installation

This chapter describes the tasks you must perform before you begin to install a Cisco uBR7100 series router and includes the following sections:

Tools and Parts Required, page 2-1

Shipping Container Contents, page 2-2

Safety Guidelines, page 2-3

Site Requirement Guidelines, page 2-6

Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment. Statement 1030

Warning Read the installation instructions before connecting the system to the power source. Statement 1004

Tools and Parts Required

Cisco uBR7100 series routers are fully assembled at the factory; no additional assembly is required prior to installing the router. The following tools and parts are shipped with Cisco uBR7100 series routers (unless noted otherwise) and are required for installation:

Electrostatic discharge (ESD)-preventive wrist strap (not included with the router)

Number 2 Phillips screwdriver (not included with the router)

Flat-head screwdriver (not included with the router)

Rack-mount and cable-management kit for 19- inch, four-post or telco-type rack installation (mounting brackets for a 23- or 24-inch rack are available separately)

Rubber feet for desktop installation

One double ground lug and two 3.5 x 8-mm screws for grounding the chassis. This optional procedure also requires a 6-AWG grounding wire, a crimping tool suitable for the wire, and a knife or wire stripper.

Cisco uBR7100 Series and Cisco uBR7100E Series Universal Broadband Router Hardware Installation Guide

 

OL-5916-01

2-1

 

 

 

Page 41
Image 41
Cisco Systems UBR7100E manual Preparing for Installation, Tools and Parts Required