Chapter 2 Switch Installation
Preparing for Installation
Installation Guidelines
When you decide where to place the switch, be sure to observe these requirements:
•For copper Ethernet ports, including 10/100 ports, 10/100/1000 ports, and
•See Table
•See the Catalyst 3750 release notes for cable requirements for XENPAK module connections. Each port must match the
Note When you use shorter distances of
When the
•The operating environment must be within the ranges listed in Appendix A, “Technical Specifications.”
•Clearance to front and rear panels must be such that
–You can easily read the
–Access to ports is sufficient for unrestricted cabling.
Make sure that there is access to the rear of the rack if you are planning to stack the switches. If you do not have access to the rear panel, make sure that you cable the switches before you
–The AC power cord can reach from the AC power outlet to the connector on the switch rear panel.
•Cabling must be away from sources of electrical noise, such as radios, power lines, and fluorescent lighting fixtures. Make sure the cabling is safely away from other devices that might damage the cables.
•Airflow around the switch and through the vents must be unrestricted.
•Temperature around the unit should not exceed 113°F (45°C).
Note If you install the switch in a closed or multirack assembly, the temperature around it might be greater than normal room temperature.
Catalyst 3750 Switch Hardware Installation Guide
|
| ||
|
|