Cisco Systems WSC3750X24TS specifications Verifying Package Contents, Verifying Switch Operation

Models: WSC3750X24TS

1 144
Download 144 pages 14.95 Kb
Page 44
Image 44
Verifying Package Contents

Chapter 2 Switch Installation

Preparing for Installation

Verifying Package Contents

Note Carefully remove the contents from the shipping container, and check each item for damage. If any item is missing or damaged, contact your Cisco representative or reseller for support. Return all packing material to the shipping container, and save it.

The switch is shipped with these items:

The Catalyst 3750 Switch Getting Started Guide (Catalyst 3750-24TS,3750G-24TS-1U,

3750G-24T, 3750G-24TS, 3750-48TS, 3750G-48TS, 3750-24PS, 3750G-24PS, 3750-48PS, 3750G-48PS and 3750G-16TD switches)

The Catalyst 3750G Integrated Wireless LAN Controller Switch Getting Started Guide (3750G-24WS-S25 and 3750G-24WS-S50 switches)

The Regulatory Compliance and Safety Information for the Catalyst 3750 Switch

AC power cord (AC-powered switches)

DC terminal block plug (DC-powered switches)

One RJ-45-to-DB-9 adapter cable

Mounting kit containing:

Four rubber feet for mounting the switch on a table

Two 19-inch rack-mounting brackets

Four Phillips flat-head screws for attaching the brackets to the switch (Catalyst 3750G-24TS switch)

Six Phillips flat-head screws for attaching the brackets to the switch (Catalyst 3750-24TS, 3750G-24TS-1U, 3750G-24T, 3750-48TS, 3750G-48TS, 3750-24PS, 3750G-12S,

3750G-12S-SD, 3750G-24PS, 3750-48PS, 3750G-48PS, 3750G-16TD, 3750G-24WS-S25, and 3750G-24WS-S50 switches)

Four Phillips machine screws for attaching the brackets to a rack

One cable guide and one black Phillips machine screw for attaching the cable guide to one of the mounting brackets

One RPS connector cover (for wall mounting)

Two Phillips pan-head screws (for attaching the RPS cover)

Four Phillips truss-head screws (for wall-mounting brackets)

StackWise cable: 0.5-meter, 1-meter, or 3-meter cable.

Note If you do not specify the length of the StackWise cable, the 0.5-meter cable is supplied.

Verifying Switch Operation

Before you install the switch in a rack, on a wall, or on a table or shelf, you should power on the switch and verify that the switch passes POST. See the “Running Express Setup” section in the getting started guide for the steps required to connect a PC to the switch and to run Express Setup.

Catalyst 3750 Switch Hardware Installation Guide

2-6

OL-6336-07

 

 

Page 44
Image 44
Cisco Systems WSC3750X24TS specifications Verifying Package Contents, Verifying Switch Operation