OPERATING INSTRUCTION

RUN – IN PROCEDURE

If run-in instructions for a new engine are not followed, you can cause damage to piston rings and cylinder walls.

LOAD

Never operate an engine immediately under full load. Allow the engine to warm up before operating it at full load. Run-in the engine carefully as shown in the table.

 

Engine Speed

 

Period

Control Lever

Load

 

Position

 

 

Fully

Maintain engine speed

1st Hour

100 RPM above full load

advanced

 

governed speed

 

 

2nd

Fully

Full load governed

Through

speed with occasional

advanced

5th Hour

short periods of lighter load

 

 

 

NO LOAD

Do not run the engine at idle speed. When not operating the engine with a load, you can keep the correct engine operating temperature if you run the engine at approximately 1500 RPM.

REAR WHEEL BOLTS

After the first 10 hours of operation, check the rear wheel bolts. Tighten all wheel bolts to the torque give in the Wheel Mounting Torques in this manual.

FRONT WHEEL BOLTS

After the first 10 hours of operation, check the front wheel bolts. Tighten the bolts to the torques shown in the Wheel Mounting Torques in this manual.

FRONT FRAME BOLTS

After the first 10 hours of operation, check the front frame bolts. Tighten the bolts to the torque shown below.

Front Frame Mounting Torques

Side (M12x35), 12Bolts (6LH and 6RH) … 83 to 93 Nm (61 to 69 lb ft)

LOWER LINK BRACKET BOLTS

After the first 10 hours of operation, check the Lower Link Bracket bolts. Tighten the bolts to the correct tightening 39 to 44 Nm (29 to 33 lb ft).

37

Page 45
Image 45
Cub Cadet 7532, 7530 manual RUN in Procedure