Fujitsu AOU12RL2, ASU12RL2 manual Defrost Flow Chart, Normal defrost, Integrating defrost, 01-14

Models: ASU12RL2 AOU09RL2 AOU12RL2

1 62
Download 62 pages 59.61 Kb
Page 19
Image 19
3. Defrost Flow Chart

3. Defrost Flow Chart

The defrosting shall proceed by the integrating operation time, outdoor temperature and outdoor heat exchanger temperature as follows.

Heating operation start : Compressor ON

(Not defrosted for 10 minutes)

Normal defrost

Integrating defrost

Outside air temp. > -10°C= (14°F)

Outdoor HEX temp.

Below - 17°C(1.4°F)

Outside air temp. < -10°C(14°F)

Outdoor HEX temp.

-Outside air temp. Below - 7°C(-44.6°F) or

Outdoor HEX temp. Below - 20°C(-4°F)

Intermittent

operation

Continuous operation

 

 

 

 

 

 

 

 

Compressor

 

Compressor

 

Compressor

 

OFF count :

 

integrating

 

integrating

 

40 times

 

operation:

 

operation:

 

(Less than 10min.)

 

Over 240 min.

 

Over 213 min.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Outdoor

 

Outdoor

 

 

 

 

heat exchanger

 

heat exchanger

 

 

 

 

temperature:

 

temperature:

 

 

 

 

Below - 3°C

 

Below - 5°C

 

 

 

 

(26.6°F)

 

(23°F)

 

 

 

 

 

 

 

 

Defrost start

Defrost Indicator: [Operation lamp]

7 sec ON / 2 sec OFF

01-14 Outdoor fan : OFF

Manual background Compressor speed : 0 rps

Manual background 4-way valve : OFF

Manual background Compressor speed : 90rps

Outdoor HEX temp.: Over 16°C (60.8°F)

or

Compressor ON time: Maximum 15 minutes

Defrost end

01-14

Page 19
Image 19
Fujitsu AOU12RL2, ASU12RL2, AOU09RL2 manual Defrost Flow Chart, Normal defrost, Integrating defrost, 01-14