Installing the hardware
IFor
For information on mounting of the rails in the
3rd party racks
Certain general conditions must be met:
–Installation dimensions (see the dimensions shown in figure 2 on page 42):
1 Front of rack
2 Rear of rack
A Rack depth (comparison PRIMECENTER Rack 940/1000/1100 mm)
B Rack width (comparison PRIMECENTER rack 700 mm)
C Clearance for 19" installation level C1 Front 19" installation level
C2 Rear 19" installation level
D Cable routing area (cable area depth) and ventilation
E Space for front panel and ventilation
F Space for right and left support systems
P PRIMERGY server installation depth a1 Front left support upright
a2 Front right support upright
b1 Rear left support upright
b2 Rear right support upright
BX400 S1 | Operating Manual | 41 |